Reports until 16:00, Thursday 20 April 2023
LHO General
ryan.short@LIGO.ORG - posted 16:00, Thursday 20 April 2023 (68863)
Ops Day Shift Summary

TITLE: 04/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY: Sensor correction was left on at EY through the locking sequence mid-morning, then turned off once at low noise so the wind fence crew could start work, and then on again when they finished. This process went smoothly and worked well for keeping a long lock stretch today; currently have been at NLN for 5 hours.


LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:04 ISC Gabriele CR - PRM measurements 17:01
16:00 SQZ Nutsinee LVEA - SQZ Local PD checks on-table 16:44
16:22 SAF Austin, Ibrahim EX - Turning on ALS laser 16:44
16:31 SAF TJ, Tony EY - Turning on ALS laser 16:43
16:34 SAF Richard, Danny EY - Wind fence 16:55
16:44 SAF TJ, Tony LVEA - Turning on CO2 lasers 17:01
17:04 SQZ Nutsinee LVEA - SQZ Local SQZ table work 17:55
17:05 VAC Gerardo, Travis, Jordan EY - Hepta pump checks 17:40
17:05 SAF Danny MX, MY - Safety checks 18:10
17:09 CAL Tony PCAL Lab Local Responsivity measurements 17:56
17:17 EE Fil LVEA - SQZ - Checking on PEM coil 17:37
17:37 FAC Karen, Kim FCES - Technical cleaning 17:59
17:52 FAC Randy, Mitchell EY - Wind fence work 22:04
17:59 FAC Kim H2 - Technical cleaning 18:40
18:14 SEI Jim Office - ETMY ISI filter updates 19:14
18:15 SQZ Daniel, Nutsinee LVEA - SQZ Local SQZ table work 19:19
19:52 SQZ Nutsinee LVEA - SQZ Local SQZ table work 22:10
20:08 VAC Gerardo MX - Hepta pump 22:08
21:29 FIT Gabriele Arms - Running 22:36