BSC2 NE Vert HEPI Actuator back in RUN mode (Hugh)
Operate HAM3 East Door RGA (John)
More work on TMTS (Transmon Telescope SUS) model by Mark B starts around 10:45am (requiring DAQ restart by Dave afterward)
PCal Work starting in H2 PSL Room (Pablo, Colin, Craig, Michael R.)
CDS Alarm: several h1iscey IOP State Word alarms several times a day
Jim B shutting down framewriter0 (10:35am)
changing compressor at MX; gave instrument air alarm, and also Vacuum alarm for CP6 since we use Instrument Air for the valve. (Ski)
Crew here for taking water samples at 11:40am