Displaying report 1-1 of 1.
Reports until 11:32, Wednesday 26 June 2013
H1 ISC
lisa.barsotti@LIGO.ORG - posted 11:32, Wednesday 26 June 2013 (6891)
Summary status of EX TRANSMON ISC table
The assembly of the TMS ISC table is essentially done.
As far as I know, the only missing things to be installed are:

- everything related with cabling - pico cables, cable brackets, cable posts and cable ties
- one leg of the high beam dump 
- the optic (HR532HR1064, E1000425) for the bottom mirror of the periscope is ready to be installed, it is packed and labeled in one of the plastic bins under the ISC optics table at EX. 
- lens tags for the 1" lenses of the green sled (f = -56mm, I gave them to Corey)

Yesterday we finished doing the "coarse" alignment of the 532 nm and 1064 nm paths (a picture of the set-up will follow).
We also tested the QPDs.
To align the path from the beam diverter to the high power beam dump we used the green laser beam at full power.
The "fine" alignment will be done once the ISC table is mated to the transmon telescope.
Displaying report 1-1 of 1.