TITLE: 04/24 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY:
Locks:
Lockloss at 20:22 UTC due to a 7.1 magnitude Indonesia earthquake (10hr 15 min lock).
Put IFO in DOWN while the earthquake rings down
IFO went into SEI_CONF EARTHQUAKE mode for ~15s before losing lock
Achieved NLN after shift - started locking as shift ended.
Manual Touching:
SQZ was touched up at 16:17 UTC →16:45 UTC
Done due to live squeezing looking worse than the 4/20 reference - Camilla realized this and took a new reference.
Changing the SQZ phase, I started at 164.03 Deg and ended at 135.59 Deg
Resulted in FDS lower than the last 4/20 reference as well as Camilla’s reference - both as seen on the FDS FOM.
Turned off sensor correction at 20:44 UTC by changing SEI_ENV to maintenance. This put SEI_CONF from EARTHQUAKE to SC_OFF. This was done due to the Earthquake.
SEI_ENV and SEI_CONF returned to EARTHQUAKE Mode with sensor correction on. This happened at 21:51 UTC.
Turning back to SEI_ENV is CALM (SEI_CONF is WINDY) at 22:43 UTC
Turned on ALS Polarizer through ALS Guardian (to fix some polarization ring-ups) at 21:23 UTC.
SUS_RM1 and SUS_RM2 turned to SAFE at 22:02 UTC.
SUS_RM1 and SUS_RM2 returned to ALIGNED at 22:35 UTC.
Done due to a power supply switch.
Automatic Early Morning Lock:
This morning’s running 5-hour lock was automatic. There seem to have been three NLN attempts during Sunday night, two of which were successful!
Attempt 1: Started trying at about 5:07 UTC (22:07 PDT) and eventually achieved NLN at around 6:00 UTC (23:00 PDT) before losing lock 1 hour and 48 minutes later at 07:45 UTC (00:45 PDT). Relocking was attempted immediately after lockloss.
Attempt 2: Reached and stayed CAMR_TO_TR at 8:31 UTC (1:31PDT) for ~9 minutes before losing lock at 8:40 UTC (1:40 PDT). Relocking was attempted immediately after lockloss.
Attempt 3: Reached NLN at around 10:06 UTC (3:06 PDT), which was the state I found it in.
Other:
- Dust monitor investigation at 16:55UTC -
- The locked period of the day had a couple of state changes between Cal Meas and NLN for measurement taking.
Cal Meas at 18:27 UTC
Back to NLN at 19:02 UTC
Cal Meas at 19:52 UTC
Back to NLN at 20:11 UTC
- At 19:33 UTC - Monthly Hanford Site scheduled test alert successful (and at the right, right phone)
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:03 | FAC | Karen | Optics & Vacuum Prep Labs | N | Technical Cleaning | 15:28 |
| 15:28 | FAC | Karen | MY | N | Technical Cleaning | 16:26 |
| 16:18 | FAC | Kim | MX | N | Technical Cleaning | 17:18 |
| 16:49 | FAC | Tyler | EX (Chiller Yard) | N | Dropping Parts | 17:19 |
| 17:34 | CDS | Marc | CER Mezzanine | N | Writing down values | 17:54 |
| 17:35 | FAC | Karen & Kim | FCES | N | Technical Cleaning | 18:11 |
| 19:51 | CDS | Fil | EX & EY | N | PEM Injection Work | 20:51 |
| 20:49 | VAC | Gerardo & Travis | LVEA | N | Ion Pump Measurements | 21:09 |
| 21:01 | CDS | Fil | EY & EX | N | Electronics Work | 23:30 |
| 21:20 | EE | Marc. Jason, Fernando, Betsy | CER Mezzanine | N | Stagnig for Tues Maint | 21:49 |
| 21:26 | VAC | Vac Team | MX | N | Purge AIR Check | 22:03 |
| 21:46 | SYS | Gabriele | X/Y Arms | N | DSR (Daily Schedule Run) | 23:08 |
| 22:05 | CDS | Marc, Fernando | CER Mezzanine | N | Switch Power Supply | 22:29 |
| 22:21 | SUS | Betsy | LVEA | N | Walkabout | 23:08 |