TITLE: 04/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 3mph Gusts, 2mph 5min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.13 μm/s
QUICK SUMMARY:
When I Arrived the IFO Was still at Nominnal Low noise, but DARM FOM was disconnected from source.
Lock Loss immideiately after I took SEI_ENV to Maintenance.
The Lock was 3 hours 5 minutes long. Hopefully the In lock charge measurments went through.