Reports until 16:01, Tuesday 25 April 2023
H1 General
anthony.sanchez@LIGO.ORG - posted 16:01, Tuesday 25 April 2023 (69009)
Tuesday Afternoon OPS Shift End Update


TITLE: 04/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY:
LOG:

IFO Is currently Locked in NLN_CAL MEAS


Today's Lockloss List :
First lockloss happened right after I requested SEI ENV to go to Maintenance mode.
https://ldas-jobs.ligo-wa.caltech.edu/~lockloss/index.cgi?event=1366470047

Maintenace:
-(7:45am-8am) In-lock Charge Measurements if IFO is locked.

-8am - FAC - More Vinyl Work-                                                                      

-APS door security vendor at FCES/VEA door and high bay LVEA door

-8am - EY Charge (Rahul)

-8am - Corner, then EX, then EY - Jim /CDS - Restart BSC ISI and SEIPROC models.
Continuing ECR updates from HAM work last week, seiproc is getting some dolphin
channels for related to eq mode. Will require daq restarts, and time to copy filters in.

-CDS - DAQ restart to take in 2 new Guardian nodes and remove one node .

- Update to CAL-CS and PCAL Models (Kissel)

-CDS - Marc - Replace two identified overheating power supplies in the CER.
Mezanine Rack C1 U29-U31 LeftHandSide (LHS) +18V 5A -- (SUS C6 ITMs BS) --
Mezzanine Rack C5 U13-15 RightHandSide (RHS) -18V 5A -                                            

-EY - CDS -changed the connections for the daq data and regular FE ip traffic between end-y and mid-y. We changed from standard SFPs to bi-directional sfps.

-EY - VAC - perform functionality test on turbo/hepta pumps.


Post Maintenance Locking:
Tried to use H1 Manager Gaurdian for initial alignment.
It struggled to get green arms just right, but was able to get through initial alignment just fine.
After that it re-requested initial alignment agian, TJ and I then took over and started the normal locking process with out H1 Manager.

Once I started locking it was smooth sailing all the way up to NOMINAL_LOW_NOISE
Comissioning button set so Elena can do some tests.


NUC 30 (DARM screen) needs to have GDS removed from the channels to run correctly for more than an hour or 2.

22:05 IFO taken to NLN_Cal_Meas

22:18 Erik Von Reese turned GDS back on the DARM screen. we are trying to determine how long it takes to freeze the DARM display.
                                                                                                                                                                                                                                                                                                                        

Start Time System Name Location Lazer_Haz Task Time End
14:54 FAC Karen EY N Technical cleaning 16:33
14:55 FAC Kim EX N Technical Cleaning 16:16
15:07 SUS Ryan C CTRL Rm N EY Charge measurements 16:03
15:16 FAC Vinyl LVEA N Flooring work 19:16
15:19 CDS Dave Barker   N CDS Model & DAC Restarts 19:17
15:32 EE Fil CS,EX&Y N PEM Power Supply & Microphone work 19:17
15:38 VAC Gerardo CS , EX &Y N Vacuum System work 19:18
15:40 FAMIS Ryan S CS, EX & Y N HEPI & dust Pump FAMIS Tasks 16:31
15:41 FAC MItchel & Randy EY N Wind Fence repair work 18:40
16:08 FAC Chris LVEA N Filling up forklift batterys 16:45
16:15 FAC Apollo FCES N Installing locks and security 21:14
16:23 SEI Jim CTRL Rm N Restart BSC ISI AND SEIPROC models 17:03
16:30 VAC Jordan, Travis EX & EY N Vacuum work 19:15
16:41 EE Marc & Fernando CER N Replacing 2 Power supplies, SUS taken to Safe! 17:38
16:44 OPS Ryan S EY N Wind Fence tractor driving 18:24
16:46 FAC Chris EY & EX N Filling fork lift Batteries 18:03
16:50 Tour Gabriele + 2 LVEA N LVEA tour 17:35
16:51 PSL Jason LVEA WBay N Checking out Test stands 18:51
17:00 EE Betsy CER N Working with Marc 17:38
17:16 FAC Cindy,Karen,Kim LVEA N Technical cleaning 18:32
18:00 CDS Jonathan & Fil EY N Taking PEM Y offline for a few moments 19:44
18:03 SEI Jim CER N Resetting signals to watchdogs via CER racks. 18:04
18:04 FAC Chris Wind - Y N Helping with the Wind fence at End Y 19:17
18:51 ASC Elena LVEA N Pluging in SR75 into rack 19:16
19:09 PEM Adrian EX N Checking sensors 19:35
19:20 Vac Nitrogen EX N Nitrogen delivery since 11:30 20:10
19:52 SEI Jim Ctrl RM N SEI Transition checks and testing 20:06
19:56 LVEA LAZSER HAZARD LVEA YES THE LVEA IS LASER HAZARD 07:56
20:05 SQZr Nutsinee, Danelle LVEA SQZr Bay Checking SQZ Table 22:35
21:28 VAC Travis EX N In mechanical room working on pump for past hour. 21:28
21:35 SQZr Naoki SQZ table 0 YES Helping Nutsinee 22:11
21:50 ALS Elena Ctrl Rm N Open Loop Measurment of CARM 22:10
22:11 EE Fil LVEA SQZT0 YES Running Cables to SQZr Rack. 22:22
22:42 Commish Elena CTRL RM N CARM & PCAL Meas. & PCAL -> Darm TF 22:57