Displaying report 1-1 of 1.
Reports until 00:01, Saturday 29 April 2023
H1 General (ISC)
austin.jennings@LIGO.ORG - posted 00:01, Saturday 29 April 2023 (69172)
Friday Eve Shift Summary

TITLE: 04/28 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
SHIFT SUMMARY:

Main Notes:

- LVEA is LASER HAZARD until at least Monday morning

- IFO is in Observing mode as of 06:47 Apr 29th UTC

- Lock #1:

- Held at ENGAGE ASC since ADS PIT/YAW 3 were not converging whatsoever

- Lock #2:

- LOCKLOSS @ 0:25 - LOCKING ARMS GREEN, unknown reason

- Lock #3:

- This lock went fairly well, acquired NLN @ 01:56 UTC

- Do have a "Diffracted power low" on DIAG_MAIN for the PSL 

- There were differences in the observe SDFs preventing me from going into Observe but after talking with commissioners, they have been reconciled - Screenshots attached

- IN OBSERVING: 02:59 UTC

- EX saturation @ 04:41, no ringups on ASC but do see a glich/spike on the OAF BLRMS screen for all bandpasses and DCPD saturations went bonkers for a second - glitch?

- LOCKLOSS @ 04:44 (DCPD saturation on verbal), shortly after, probably due to whatever caused the glitch above

- Lock #4/5/6:

- Had to touch ALS DIFF just a hair to catch IR

- LOCKLOSS @ 05:19 ACQUIRE DRMI, then again at LOCKING_ALS, then again at LOCKING_ALS...

- Lock #7:

- GRD was able to do most of the heavy lifting but still noticing that the ADS PIT/YAW 3 going off the rails when we get to ENGAGE ASC - but after awhile it calmed down and started to converge

- Acquired NLN @ 06:20 UTC

- IN OBSERVING: 06:47 UTC

Other Notes:

- Upon finishing an initial alignment, ISC LOCK went into ERROR - see screenshot

- The ALS GRD went through CHANGE_POL and in doing so created an Observe sdf diff in SYSCSAUX, the channel in question was just a step size so I vote we unmonitor this channel (and channels alike) so we don't run into it in the future

LOG:                                                                                                                      

Start Time System Name Location Lazer_Haz Task Time End
19:56 LVEA LASER HAZARD LVEA YES THE LVEA IS LASER HAZARD 10:54
22:59 CAL Elenna CR N Test new HAM1 FF loop 23:17
23:35 ISC Elenna PSL racks YES Switch SR785 for CARM sensing 23:44
Images attached to this report
Displaying report 1-1 of 1.