Reports until 16:01, Monday 01 May 2023
H1 General
ryan.crouch@LIGO.ORG - posted 16:01, Monday 01 May 2023 (69212)
OPS Monday shift summary

TITLE: 05/01 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 138Mpc
SHIFT SUMMARY:

Lock#1

LOCK #2

 

LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:56 LVEA LASER HAZARD LVEA YES THE LVEA IS LASER HAZARD Ongoing
15:13 FAC Kim Optics lab N Tech Cleaning 15:30
16:24 FAC Mitch, Randy EndY N Wind Fence work 22:18
16:40 FAC Chris EndY N Wind fence work 22:18
16:47 FAC Cindy MidY N Tech clean 17:58
16:56 FAC Kim MidX N Tech clean 17:54
17:16 CAL Rick PCAL lab LOCAL PCAL work 18:22
17:19 EE Fil CER N Inventory check 17:30
17:35 CAL Elenna CR N CARM measurement 17:53
17:42 CAL Elenna LVEA Y Check on SR785 17:51
17:48 SQZ Vicky CR N New SQZ reference 18:36
18:00 CAL Elenna LVEA N Check on SR785 18:17
18:57 CDS Jonathon MidX N Rack checks 19:25
20:00 SQZ Vicky CR N SQZ work 21:19
20:02 CAL Dripta PCAL LOCAL PCAL work out @ 21:33 21:33
20:07 SUS Ibrahim, Austin CER N Checking equipment 20:40
20:27 CAL Elenna CR N CARM measurement 20:30
21:02 CAL Elenna CR N CARM measurement 21:03
21:09 VAC Travis & Gerardo EndY N Mech room, check a pump 22:14