TITLE: 05/02 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
SHIFT SUMMARY:
Fairly light Maintenance. Did have some issues with the BSC1 SEI power supply swap (IO Chassis needed to be swapped instead of what was planned and an additional power supply in rack was swapped as well). Handing over H1 to Camilla as we get to MAX POWER for Elenna to do checks on the laser after today's PSL work.
LOG:
- 1443 LVEA transitioned to SAFE (betsy)
- 1458 vinyl people arrive, contacted soike
- BSC2 ISI errantly taken to DAMPED (later returned to its fully isolated no st2boo state)
- BSC1 SEI node taken to DAMPED + HEPI OFFLINE (for power supply work by marc)
- HAM2 & HAM6 climbing (fil):
- SEI: damped & hepi offline
- SUS: guardians taken to SAFE
- 1656 Mic cabling assistance to fil (adrian)
- 1510-1620 SUS charge (ryanC)
- 1515-1612 EY cleaning (kim.cindy)
- 1530 PSL tune up (jason, ryanS)
- 1543-1622 calcs, oaf, sqz model restarts + daq restarts (jeff,dave)
- 1546-1855 hepta pump work (travis,jordan,gerardo)
- 1645-1656 checking parts in lvea (jordan)
- more parts searching at mids also (jordan, travis)
- 1602-1625 HAM7 to DAMPED for SEI measurement (jim)
- 1614-1635 EX magnetometer plugged in for O4 (adrian)
- 1625-1630 PSL rack (elenna)
- 1646-1820 sqz cable investigation related to CLF ISS (daniel)
- Swapping sqz chasis instead (daniel)
- 1723-1850 BSC1 sei Power Supply swap (marc)
- IO Chasis ended up glitching (marc was replacing this power supply)
- Also discovered that 18V power supply (-18 one) was "howling", so it is also being replaced.
- 1724 Lawn service
- zotws20 work station in control room is dead (Luis notified cds staff)
- 1801 Norco LN2 truck arrival at corner's cp2
- 1817 Dust Monitor10 alarm
- 2020-2109 Continued hepta pump work at EY (travis,jordan)
- 2049-2119 Guardian work for CHECK IR (tj, "automation work" and time marked as COMMISSIONING)
- 2143 Looking at parts in lvea (gerardo.jordan)
- 2149 parts search at MY (travis)
- 2216-2233 Initial Alignment
- Had a few locklosses at FIND_IR/LOCKING_ALS, but eventually got through FIND_IR (took about 7-min as it swept COMM OFFSET).
- Going to MAX POWER so Elenna can look at how the PSL looks after the laser work from earlier today.
- 2222-2301 Sqz rack checks (vicky, daniel, naoki)
- 2252 Going to lvea to look for s/n's on part (gerardo)