Reports until 09:48, Tuesday 02 May 2023
H1 AOS
adrian.helmling-cornell@LIGO.ORG - posted 09:48, Tuesday 02 May 2023 (69242)
EX Floor Magnetometer Box Swap

I replaced the signal conditioning box for H1:PEM-EX_VEA_FLOOR_X/Y/Z_DQ with one that Fil supplied. The swap was complete at 16:25:00 UTC.