Displaying report 1-1 of 1.
Reports until 00:01, Wednesday 03 May 2023
LHO FMCS (CAL, PSL, SQZ)
camilla.compton@LIGO.ORG - posted 00:01, Wednesday 03 May 2023 (69274)
OPS Evening Shift Summary

TITLE: 05/03 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 138MPc
SHIFT SUMMARY: Locked most of the shift. We've had DARM spring measurements (alog69261), and Louis runnning a Caibration Suite.
LOG:

Had increased PSL dust counts with the main room alarming but 500nm counts remained below 50. Plot attached, tagging PSL. Expect this was due to LVEA work today and some 20mph winds.

Lock #1. Initial alignment by Corey. Reached NLN at 23:32UTC, lost lock at 00:15UTC,

Lock #2. Automatic apart from I touched TMSX. Reached NLN at 01:08UTC.
SDFs to get back into Observing:
Start Time System Name Location Lazer_Haz Task Time End
22:37 sqz Vicky.Naoki.Daniel lvea n at sqz racks 23:01
22:53 vac Gerardo lvea n looking for part 23:07
23:25 COMM Elenna CR N Manually adjusting PSL power 23:31
23:35 COMM Jennie CR N DARM spring measurements (NLN_CAL_MEAS on/off) 04:18
23:52 COMM Naoki CR N Camera Servo work 00:20
00:42 SQZ Naoki, Vicky CR N Injecting SQZ while IFO is acquiring lock, FC ASC work. 01:18
01:19 SQZ Vicky CR N Moving ZM4 back to inital alignment (ASC should make ZM5,6 follow) 04:19
03:13 FAC Alarm CR N RO water alarm. Tagging FMCS. 03:14
05:02 CAL Louis Remote (TS) N Calibration Suite 06:24
Images attached to this report
Displaying report 1-1 of 1.