TITLE: 05/03 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 138MPc
SHIFT SUMMARY: Locked most of the shift. We've had DARM spring measurements (alog69261), and Louis runnning a Caibration Suite.
LOG:
Had increased PSL dust counts with the main room alarming but 500nm counts remained below 50. Plot attached, tagging PSL. Expect this was due to LVEA work today and some 20mph winds.
Lock #1. Initial alignment by Corey. Reached NLN at 23:32UTC, lost lock at 00:15UTC,
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
22:37 | sqz | Vicky.Naoki.Daniel | lvea | n | at sqz racks | 23:01 |
22:53 | vac | Gerardo | lvea | n | looking for part | 23:07 |
23:25 | COMM | Elenna | CR | N | Manually adjusting PSL power | 23:31 |
23:35 | COMM | Jennie | CR | N | DARM spring measurements (NLN_CAL_MEAS on/off) | 04:18 |
23:52 | COMM | Naoki | CR | N | Camera Servo work | 00:20 |
00:42 | SQZ | Naoki, Vicky | CR | N | Injecting SQZ while IFO is acquiring lock, FC ASC work. | 01:18 |
01:19 | SQZ | Vicky | CR | N | Moving ZM4 back to inital alignment (ASC should make ZM5,6 follow) | 04:19 |
03:13 | FAC | Alarm | CR | N | RO water alarm. Tagging FMCS. | 03:14 |
05:02 | CAL | Louis | Remote (TS) | N | Calibration Suite | 06:24 |