TITLE: 05/04 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY:
Main Notes:
- LOCKLOSS @ 14:35 UTC, DCPD saturation, then again trying to relock at LOCKING_ALS, not sure why
- Held at LOCKING_ALS to allow TJ for automation work on IR locking
- Lock #1:
- Lock #2:
- Other Notes:
- Unmonitored ALS POL step size channel - Screenshot attached
- PSL DM counts - room 101 300 nm alert - trended at was ~320 counts and has been slowly creeping up over the past 4 hrs, Screenshot attached
- Vicky reverted the PI damping guardian to old working settings (success)
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 13:19 | grd ALS | Jenne | home | n | init align | 14:01 |
| 15:33 | FAC | Tyler | EY | N | Repair a flat | 17:33 |
| 15:38 | PEM | Fil | LVEA | N | Terminate cables | 16:28 |
| 16:38 | FAC | Kim | CER | N | Grab kits | 17:38 |
| 16:50 | PEM | Fil | EY | N | Switch cables | 17:23 |
| 17:26 | PSL | RyanS | CR | N | ISS second loop investigations | 17:29 |
| 17:34 | EE | Fil | OSB Rec. | N | Drop off parts | 18:44 |
| 17:56 | ISC | Elenna | CR | N | Measurement | 17:58 |
| 18:08 | SUS | Rahul/Karla | CER | N | Grab parts | 18:18 |
| 20:39 | PSL | RyanS | CR | N | ISS second loop troubleshooting | 21:27 |
| 20:46 | PCAL | Tony | PCAL Lab | Y (LOCAL) | Take pictures | 20:56 |
| 21:23 | CAL | Jeff/Louis | CR | N | Calibration sweeps | 00:23 |
| 22:36 | VAC | Travis/Gerardo | MX | N | Measure pumps | 00:36 |