TITLE: 05/05 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
SHIFT SUMMARY: Locked for the first half of shift and high winds and an earthquake kept us unlocked for the second half. Currently locking well at ENGAGE_ASC_FOR_FULL_IFO.
LOG:
Lock #1. Locked for 6h53.
Completed Calibration measurements (
alog69333) and 1+ hour of Observing.
Lockloss at 03:07. Not ASC, though there is a little ring up in LSC_PRCL_IN1 before lockloss,
see attahced. It was also about the time the wind picked up,
attached plot.
Lock #2.
High winds (gusts up to 50mph) meant we couldn't lock DRMI, I tried an initial alignment that finished at 4:39.
Still loosing lock below DRMI from the wind so held in DOWN for a while.
Locked to CHECK_VIOLINS_BEFORE_POWERUP when at 5:53UTC a earthquake knocked us back to DOWN.
PSL dust counts were high (90 counts of 500nm for the PSL101,
plot attached) from the wind.
Tagging PSL.
I've been noticing a loud periodic (~30seconds) clicking from the overhead pager outside the CR door, have notified Richard. Tagging DetChar.
| Start Time |
System |
Name |
Location |
Lazer_Haz |
Task |
Time End |
| 21:23 |
CAL |
Jeff/Louis/Camilla |
CR |
N |
Calibration sweeps |
02:00 |
| 22:36 |
VAC |
Travis/Gerardo |
MX |
N |
Measure pumps |
00:00 |
| 01:25 |
- |
Rick |
Arms |
N |
Bike Ride |
02:50 |
| 02:00 |
CDS |
Nyath, Jonathan |
Offices |
N |
Internet down alog 69337 |
05:02 |