Reports until 12:14, Friday 05 May 2023
LHO VE (PEM, VE)
travis.sadecki@LIGO.ORG - posted 12:14, Friday 05 May 2023 (69353)
Hepta roughing pump run at EY mechanical room

As a target of opportunity during lockloss downtime, I ran the End Y Hepta roughing pump which is located in the mechanical room from ~11:40am to ~11:50am local time.  There is an outstanding question of how much of a noise issue it is to run this pump during non-Tuesday-maintenance periods during the Engineering Run.  I have tagged PEM so they can have a look at this.