Ops Day Shift Summary

TITLE: 05/09 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
SHIFT SUMMARY: Made it back to NLN after maintenance for 35min. No initial alignment was done, but we did have to run Check MICH. We lost lock very suddenly for reasons unknown so far. Relocking now.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:05 Fac Chris, contractors LVEA n Vinyl flooring 19:07
15:06 VAC Jordan EY n Running turbo pump 18:16
15:07 Fac Mitch, Randy, contractor EY - Wind fence 19:09
15:21 PSL Jason, Ryan S PSL enc Local Alignments, measurements 19:15
15:22 PEM Fil, Adrian LVEA n Mircophone checks (1,2...) 18:33
15:23 Fac Kim, Cindi EX n Tech clean 16:54
15:26 TCS Camilla EY, EX n Turn off HWS lasers and cameras 16:06
15:26 VAC Travis EY n Hepta pump work 17:50
15:30 Fac Christina CS - Moving pallets 17:08
15:39 SUS Ryan C EX n OpLev charge measurement 16:57
15:56 CDS Marc, Fernando CER n Power supply fan swaps 18:02
15:56 VAC Mike Z, Janos LVEA n Parts hunt 16:50
16:23 CDS Jonathan, Jamie - n GDS/DMT work 17:23
16:37 CDS Dave, Daniel - n H1IOPLSC0, SQZ, OMC model restarts 17:37
16:39 Fac Chris EY, MY, CS, MX, EX n Famis checks 19:14
16:42 SEI Jim Office n HAM2/3 HEPI FF measurement 18:04
16:54 Fac Kim, Cindi LVEA n Tech clean 18:46
17:23 ENG Betsy LVEA n Take measurements on LVEA floor 17:59
17:51 VAC Travis LVEA n Looking for parts 18:01
17:53 VAC Norco MX - LN2 fill (CP5&6) 19:27
18:15 Slow Daniel CR n Beckhoff restart 18:25
18:29 CDS Marc EY n Power cycle Beckhoff chassis 18:49
18:32 SQZ Daniel LVEA n Put back equipment 18:38
18:33 PEM Fil, Adrian EY, EX n Plug in coils 19:27
18:59 CDS Fernando, Marc EX n Parts find 19:20
20:17 VAC Travis, Jordan, Janos MX n Hepta work 21:19
22:00 SEI Jim Office n HAM3 FF testing ongoing
22:50 PCAL Rick, Tony PCAL lab local PCAL measurement ongoing