Reports until 16:03, Wednesday 10 May 2023
LHO General
thomas.shaffer@LIGO.ORG - posted 16:03, Wednesday 10 May 2023 (69486)
Ops Day Shift Summary

TITLE: 05/10 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY: Large earthquake in Tonga kept us out for ~5 hours today, then a failed ADC card for IOPSEIH45. We made it up to low noise for 48 minutes and we just lost lock. Unsure as to why at the moment.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
16:33 CDS Marc CER n Check on unknown power supplies 17:33
16:42 CDS/PEM Fil EY n Address temp. power supplies 17:42
16:42 FAC Bubba EX n Removing bad floor mat 17:12
17:14 FAC Tyler, co Mids n Fire system testing 21:14
17:48 CDS/PEM Fil, Adrian CER n Magnetic injection coil testing 18:04
18:31 CDS/PEM Fil, Adrian LVEA n Pull cable under HAM4, BSC2,3 20:24
18:40 PEM Robert Ends n Prepping PEM equipment 19:40
19:45 PEM Robert LVEA n PEM prep 20:15
20:06 CDS Erik CER n Reboot IOPSEIH45 20:16
20:37 CDS Fil CER n Replace ADC card in IOPSEIH45 21:07