TITLE: 05/10 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY: Large earthquake in Tonga kept us out for ~5 hours today, then a failed ADC card for IOPSEIH45. We made it up to low noise for 48 minutes and we just lost lock. Unsure as to why at the moment.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 16:33 | CDS | Marc | CER | n | Check on unknown power supplies | 17:33 |
| 16:42 | CDS/PEM | Fil | EY | n | Address temp. power supplies | 17:42 |
| 16:42 | FAC | Bubba | EX | n | Removing bad floor mat | 17:12 |
| 17:14 | FAC | Tyler, co | Mids | n | Fire system testing | 21:14 |
| 17:48 | CDS/PEM | Fil, Adrian | CER | n | Magnetic injection coil testing | 18:04 |
| 18:31 | CDS/PEM | Fil, Adrian | LVEA | n | Pull cable under HAM4, BSC2,3 | 20:24 |
| 18:40 | PEM | Robert | Ends | n | Prepping PEM equipment | 19:40 |
| 19:45 | PEM | Robert | LVEA | n | PEM prep | 20:15 |
| 20:06 | CDS | Erik | CER | n | Reboot IOPSEIH45 | 20:16 |
| 20:37 | CDS | Fil | CER | n | Replace ADC card in IOPSEIH45 | 21:07 |