sheila.dwyer@LIGO.ORG - posted 20:29, Monday 01 July 2013 (6951)
SHG stability over 7 days
Here is a plot of the green power out of the SHG over the last 7 days. The times when the power fluctuates the most the PMC trans power is also fluctuating, the long term drift is about 5%, which is the requirement.