IFO has been locked at NLN for about 1.5 hours following a successful initial alignment and lock acquisition. Various PEM shaker injections are ongoing.
I accepted a filter change for ITMX mode 19 damping as the same filter had been accepted as on in the safe table (screenshot attached, tagging SUS).