Yesterday's (Mon 7/1) TMS (Telescope/Table) Activities
In-Vac ISC Table
-
I bumped the green alignment laser which was unfortunate, because we had one final mirror to align, but Keita was able to get this aligned after a while
-
Aligned the final ("topside") mirror on the table (this is the periscope mirror known as "M5")
-
Helicoiled the QPD Cables (D1000231)
Telescope
-
Continued inspection of 6" Mirrors we have been receiving for installation. Yesterday we looked at a mirror we received from LLO.
Misc.
-
Continue to post photos of progress to Resource Space.
-
SUS crew aim to install the Upper Mass Suspension on the EX TMS Lab Bosch Frame this week.
-
Working on making inventory/gathering cabling needed for TMS