Reports until 00:51, Sunday 14 May 2023
H1 ISC (OpsInfo)
elenna.capote@LIGO.ORG - posted 00:51, Sunday 14 May 2023 (69571)
Relocked after wind quieted down

Once the wind quieted down, I logged back in to relock. The DIFF beatnote was nonexistent, so I took us through initial alignment. It worked all the way through, no errors. Once that completed, I took us through locking. I was suprised that the IFO couldn't lock DRMI on the first try and had to go through PRMI after the timer ran out. But once PRMI locked DRMI was no problem. We are headed all the way back up to NLN for the night.