patrick.thomas@LIGO.ORG - posted 17:51, Tuesday 02 July 2013 (6965)
Ops Summary
8:46 Pablo D. and Colin S. went into the H2 PSL enclosure to work on PCAL.
9:05 Michael R. went into the H2 PSL enclosure to work on PCAL.
9:27 A truck arrived to pickup pallets.
Hugh R. restarted the end Y HEPI pump controller. (WP 4012)
Corey G. went to end Y and the end X TMS lab.
h1fw1 was taken down to attach a new SSD raid. (see entry 6963) (WP 4011)
10:51 Dick G. went into the LVEA to look at the racks by the H1 PSL and ISCT1 table.
11:12 Thomas V. went into the LVEA to take an inventory of baffles.
11:25 Jim B. went into the LVEA to restart the test stand frontend computers.
Dave B. rebooted the OAF and LSC frontend computers to try to fix IPC errors.
Dale I. brought a school tour through the control room.
Dave B. rebooted the ASC frontend computer to try to fix IPC errors. This unexpectedly created errors on most of the other frontends.
12:34 Dave B. powercycled the RFM switch at end Y to try to fix IPC errors.
1:05 Pablo D. and Colin S. went into the H2 PSL enclosure to work on PCAL.
2:32 Pablo D., Colin S. and Michael R. finished work for the day in the H2 PSL enclosure.
3:40 The commissioners rebooted seiey.
4:58 Jim B. powercycled all the frontend computers at end Y. (see entry 6966)

Jeff B. and Andres R. moved the TMS-X upper structure to end X and installed it on the Bosch frame platform. (WP 4013)
Richard M. worked on the computer for the access card reader.