Reports until 20:53, Friday 19 May 2023
H1 PEM (DetChar)
robert.schofield@LIGO.ORG - posted 20:53, Friday 19 May 2023 - last comment - 10:34, Monday 12 June 2023(69766)
Aborted HVAC experiments, site-wide HVAC shutdown increases range by 10 Mpc

I didn’t get very far in the HVAC experiments because the EY chiller water pumps did not recover from the site-wide shutdown until I went to the chiller pad and reset them. The time lag and hot day meant that I had to wait a few hours for recovery (fortunately I reset it quickly enough that we didnt loose lock). While I was waiting for EY temperature recovery, SF-6 (lab area cold-deck) went off on its own and Richard brought Ken in to work on it - he says one of the wires connected to the breaker was burned through. Ken just got it fixed and we are both headed out.

I did learn a couple of things in the abbreviated experiments:

1) both the chilled water turbulence and the turbine plenum turbulence are contributing to the vibration background at 4 Hz at EX

2) side-wide shutdown of turbines, associated chillers, and water pumps increased the range from about 128 to about 138 Mpc

Since I couldn't complete the experiments, I tried just turning the turbine flows down to pre-pandemic levels. I was unable to do this for the CS and EX HVACs - to me it seemed like vane actuator slippage, like we have seen in the past. EY AHU-1 worked fine for me and I turned the flow down from 12k to 9k CFM as agreed with Bubba. Otherwise I have left everything the same. I did not get a chance to toggle the lead chiller at EX.

EX HVAC experiments all times May 19 UTC:

16:21:51 EX chiller un-enabled, AHU manually disabled

16:32:58 CHWP-2 disable

16:39:38 All systems back on

17:08:36 Manual chiller 2 enabled uncheck, AHU-2 Manual Disable checked  

17:11:56 Chiller still on start so uinchecked chiller system enable

17:21:22 checked manual pump disable

17:35:30 system restored: AHU-2 disable unchecked, Chiller system ehable checked

 

18:43 AHU manual disable checked, Chiller system enable unchecked

~18:55 system restored

 

Site-wide HVAC off:

20:16:05 start of site off

20:23:32 back on

Comments related to this report
elenna.capote@LIGO.ORG - 10:34, Monday 12 June 2023 (70366)ISC

This plot is a bit out of date, but here is a DARM comparison for the time when the site HVAC was off. The range improvement from this HVAC shutoff that gained us about 10 Mpc appears to be a reduction in noise from 100-200 Hz in DARM. I think that region is mostly limited by jitter noise.

Images attached to this comment