TITLE: 05/23 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
SHIFT SUMMARY: We still have not fully recovered since the dolphin crash yestereday. After maintenance we took some time to investigate the PR3 movement that has been a mystery over the last week or two. Initial alignment and locking was reletively straight forward. The OMC locking problems that Ryan C ran into this morning we didn't see during our one time locking the OMC today. We recently made it to 25W and lost lock at MOVE_SPOTS, maybe because ALS was still unshuttered. Relocking again now.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:53 | FAC | Contractors | LVEA | n | Vinyl Work | 18:50 |
| 15:02 | FAC | Randy & Mitch | EndY | n | Wind fence work | 17:21 |
| 15:08 | VAC | Gerardo & Jordan | CS | n | Purge Air work | 16:41 |
| 15:11 | FAC | Kim | EY | n | Tech clean | 17:04 |
| 15:15 | PCAL | Tony, Dripta | EY | YES | PCAL meas. | 18:05 |
| 15:22 | CDS/SEI | Fil, Dave, Jim | CER | n | IOPSEIH16 ADC swap | 16:47 |
| 15:24 | FAC | Tyler | CS | n | Moving road barricades | 16:24 |
| 15:25 | FAC | Bubba, contractor | EY | n | Pick up lift with truck | 17:21 |
| 15:33 | FAC | Christina | CS | n | Moving items to recycling and to receiving | 17:23 |
| 15:42 | FAC | Chris | Outbuildings | n | Replace HVAC filters | 18:05 |
| 15:45 | FAC | APS | High bay | n | High bay access system | 19:23 |
| 15:52 | SEI/CDS | Fil | EY | n | Cable pulls for HEPI upgrade | 18:51 |
| 15:56 | FAC | Kim, Cindi | FCES | n | Tech clean | 17:06 |
| 15:56 | FAC | Kim | EX | n | Tech clean | 16:26 |
| 16:06 | FAC | Richard | LVEA, FCES | n | Check on APS | 16:06 |
| 16:11 | CDS | Marc, Dave, Fernando | CER | n | h1omc0 chassis power supply work | 17:37 |
| 16:15 | PSL | Jason | LVEA | n | Check PSL racks OK for run | 16:46 |
| 16:34 | - | Betsy | LVEA | n | Pre sweep | 17:40 |
| 16:37 | VAC | Travis, Janos | EX, EY, mids | n | HEPTA surveys | 18:25 |
| 16:42 | VAC | Gerardo, Jordan | EY - Mech room | n | Purge air | 17:38 |
| 16:45 | FAC | Bubba | LVEA | n | Looking for regulators | 17:45 |
| 16:47 | CDS | Dave | remote | n | Reboot CW machine | 17:23 |
| 17:05 | SEI | Jim | EY,EX | n | Lube HEPI fans | 17:05 |
| 17:06 | FAC | Kim, Cindi | LVEA | n | Tech clean | 18:51 |
| 17:25 | CDS | Dave | remote | n | Restart cameras | 17:40 |
| 17:38 | CDS | Marc, Feranando | CER | n | ioplsc0, iopasc0, power supply work ISC-C1/C2 racks | 18:10 |
| 17:41 | CDS | Richard | LVEA | n | Verify circuit | 17:54 |
| 17:46 | SEI | Jim | CR | n | Testing HAM3 FF filter | 18:45 |
| 17:54 | VAC | Gerardo, Jordan | CS | n | Purge air work | 19:22 |
| 18:04 | CDS | Erik | CR | n | cdsrfm dolphin work | 18:34 |
| 18:25 | - | Betsy, Travis | EX | n | Sweep | 18:54 |
| 18:55 | CDS | Fil. Marc | EX | n | Cleanup | 19:25 |
| 19:05 | - | Betsy, Travis | EY | n | Sweep | 19:31 |
| 19:09 | PEM | Adrian | EY | n | Cleanup | 19:35 |
| 19:36 | PEM | Adrian | EX | n | Cleanup | 19:51 |
| 20:38 | PCAL | Tony, Dripta | PCAL lab | local | Pcal meas | ongoing |
| 21:21 | ISC/ALS | Sheila, TJ, Betsy | LVEA - ISCT1 | local | Realign beatnotes | 21:24 |
| 21:22 | VAC | Gerardo, Jordan | LVEA | n | FTIR sample | 22:06 |
| 21:27 | VAC | Janos | MY | n | HETPA checks | 22:06 |