TITLE: 05/24 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
SHIFT SUMMARY: We had a late start to the run but managed to get a 5 hour lock in. We lost lock for reasons unknown so far. Sheila and I went into ISCT1 to fix the beatnotes that we've been struggling with for the last ~9days after reverting PR3 to its old values. We are now about to start an initial alignment with the new table alignment.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:23 | FAC | Betsy | FCES | N | Closeout checks | 14:38 |
| 14:56 | EE | Ken | Carpender shop | N | 17:25 | |
| 15:55 | FAC | Bubba | CS | n | HVAC fan shutdown/startup/adjust | 20:05 |
| 16:20 | PCAL | Dripta | PCAL Lab | local | PCAL meas. | 16:34 |
| 18:52 | PCAL | Dripta | PCAL Lab | local | PCAL meas. | 20:32 |
| 21:16 | VAC | Janos, Gerardo, Jordan | LVEA | n | Take turbo pictures | 21:30 |
| 21:49 | ALS | Sheila, TJ | LVEA - ISCT1 | local | Adjust beatnotes | 23:49 |