Displaying report 1-1 of 1.
Reports until 16:35, Wednesday 24 May 2023
LHO General
thomas.shaffer@LIGO.ORG - posted 16:35, Wednesday 24 May 2023 (69889)
Ops Day Shift Summary

TITLE: 05/24 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
SHIFT SUMMARY: We had a late start to the run but managed to get a 5 hour lock in. We lost lock for reasons unknown so far. Sheila and I went into ISCT1 to fix the beatnotes that we've been struggling with for the last ~9days after reverting PR3 to its old values. We are now about to start an initial alignment with the new table alignment.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:23 FAC Betsy FCES N Closeout checks 14:38
14:56 EE Ken Carpender shop N   17:25
15:55 FAC Bubba CS n HVAC fan shutdown/startup/adjust 20:05
16:20 PCAL Dripta PCAL Lab local PCAL meas. 16:34
18:52 PCAL Dripta PCAL Lab local PCAL meas. 20:32
21:16 VAC Janos, Gerardo, Jordan LVEA n Take turbo pictures 21:30
21:49 ALS Sheila, TJ LVEA - ISCT1 local Adjust beatnotes 23:49
Displaying report 1-1 of 1.