TITLE: 05/24 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
SHIFT SUMMARY:
Majority of the shift was focused on attempting to get H1 to lock post ISCT1 table work (worked with Sheila a little before she left for home and then with her over teamspeak). Several Full & Manual alignments were attempted with various changes made to PR2 (and a little with PR3). Unfortunately, all the alignments led to poor locking of anything past Green Arms.