Reports until 21:16, Tuesday 09 July 2013
H1 AOS
lisa.austin@LIGO.ORG - posted 21:16, Tuesday 09 July 2013 (7033)
SLC - Manifold Cryopump assembly and installation
SLC Team: Lisa C. Austin, Scott Shankle, Mike Vargas, and Nichole Washington - visiting LHO for assembly and installation.

The team went to X-End with Jodi F. to see and get a feel for the amount of working space and to map out the logistics for the assembly. The large parts will have to be craned to the assembly area (see pic 2). Jodi and Apollo are doing their best to 'expand' the cleanroom footprint for assembly and balancing. The orange conduit crossing the installation area needs to be moved (see pic 3).

Apollo transported the weldments, cylinder and face plates to X-End (see pic 1).

Gerardo M. assembled the Assembly and Lift fixtures.

Images attached to this report