LHO General
ryan.short@LIGO.ORG - posted 16:32, Tuesday 19 May 2026 (90284)
Ops Day Shift Summary

TITLE: 05/19 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: More alignment work in HAM2 and BBSS alignment today. Now that the LVEA is back to Laser SAFE, more alignment steps for the BBSS and prep for the GV7 repair can be done starting tomorrow. The SPI NPRO continues to run overnight in the optics lab with proper curtains and signage in place.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:43 SAF LASER HAZARD LVEA YES LVEA IS LASER HAZARD 23:11
14:43 FAC Kim LVEA - Technical cleaning 16:15
15:37 SUS Betsy LVEA - Looking for parts 15:51
15:49 VAC Jordan LVEA - Pump checks 15:56
15:49 SUS Ibrahim LVEA - BBSS staging 19:32
16:20 SUS Betsy LVEA - BBSS staging 17:47
16:30 PEM Ryan C LVEA - Setting up DM at test stand 16:46
16:34 FAC Kim LVEA - Technical cleaning 17:21
17:41 VAC Jordan +1 EX, MX, EY, MY - N2 tank inspections 20:22
17:52 SUS Betsy LVEA - BBSS staging 19:33
18:31 SUS Oli LVEA/Opt Lab - Grabbing parts and delivering 19:29
19:29 SPI Josh LVEA - Checking cable 19:37
20:26 VAC Travis LVEA - HAM3 feedthrus 21:23
20:28 SUS Betsy LVEA - BBSS work 22:48
20:29 IAS Jason, Ryan C LVEA - BBSS surveying setup 22:48
20:33 SUS Corey Opt/Prep Labs - Looking for parts 20:58
20:35 SEI Jim LVEA - HAM3 feedthrus 21:24
20:46 SAF Richard LVEA - Safety checks 21:15
20:48 ISC Keita LVEA Y HAM2 beam alignment 22:53
20:52 ISC Elenna LVEA Y HAM2 beam alignment 22:53
20:54 SEI Shoshana LVEA - HAM3 feedthrus 21:24
21:06 SPI Jeff Opt Lab Local SPI alignment (working late) Ongoing
21:18 EE Fil MER - HEPI electronics 23:18
21:33 CAL Tony PCal Lab Local Set up measurement 22:32
21:33 SUS Ibrahim LVEA - BBSS work 22:35
22:21 SEI Jim LVEA - Getting boxes from H2 PSL 22:27
22:58 SAF Oli LVEA - Transitioning to Laser SAFE 23:10
LHO General
ryan.short@LIGO.ORG - posted 07:41, Tuesday 19 May 2026 (90276)
Ops Day Shift Start

TITLE: 05/19 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 4mph Gusts, 1mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.19 μm/s 
QUICK SUMMARY: No alarms overnight, temperatures and dust counts looking normal. More alignment work in HAM2 planned for today along with continued prep on the BBSS in the LVEA west bay. CR workstations and wall FOMs are finishing their restarts.

LHO General
ryan.short@LIGO.ORG - posted 16:33, Monday 18 May 2026 (90271)
Ops Day Shift Summary

TITLE: 05/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Alignment work continued in HAM2 today, along with more prep of the BBSS and IAS surveying on the test stand. Since SPI alignment is ongoing on the optics lab, the laser remains on and running unattended with appropriate barriers and signage up.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:43 SAF LASER HAZARD LVEA YES LVEA IS LASER HAZARD Ongoing
14:50 FAC Kim LVEA - Technical cleaning 16:09
15:19 VAC Jordan LVEA - Pump checks 15:26
15:55 FAC Randy, Jeff LVEA - Moving IOT2L a little 16:16
15:55 SPI Jeff Opt Lab Local SPI prep 18:28
16:29 IAS Jason, Ryan C LVEA - BS FARO surveying 19:55
16:30 ISC Keita LVEA - Opening lightpipe 16:44
16:46 SUS Betsy, Ibrahim LVEA - BBSS work 18:34
16:52 TCS TJ LVEA - Checking on TCSY water lines 17:10
17:09 SUS Randy LVEA - BBSS work 20:09
17:18 SPI Josh LVEA - SPI work at SUS-R2 18:32
18:04 ISC Keita LVEA Y HAM2 beam alignment 18:28
19:26 SPI Jeff Opt Lab Local SPI alignment 21:53
19:37 ISC Keita LVEA Y HAM2 beam alignment 19:47
20:10 SEI Fil MER n HEPI electronics work Ongoing
20:10 SPI Josh LVEA - SPI work at SUS-R2 Ongoing
20:11 SUS Betsy, Ibrahim LVEA - BBSS work Ongoing
20:28 SUS Randy LVEA - BBSS work 21:38
21:06 IAS Jason, Ryan C LVEA - BS FARO surveying Ongoing
22:24 ISC Keita Opt Lab - Looking for parts 23:02
22:44 ISC Rahul Opt Lab - Looking for parts 23:02
23:03 ISC Keita, Rahul LVEA Y HAM2 beam alignment Ongoing
LHO General
ryan.short@LIGO.ORG - posted 07:38, Monday 18 May 2026 (90260)
Ops Day Shift Start

TITLE: 05/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 12mph Gusts, 6mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.15 μm/s 
QUICK SUMMARY: No alarms over the weekend, temperatures looking normal, dust counts low as well. The same 31 channels are disconnected from the EDC since the CS HEPI pump controller is still down.

Likely continuing with alignment work in HAM2 today following the ISS array replacement.

LHO General
ryan.short@LIGO.ORG - posted 16:38, Friday 15 May 2026 (90255)
Ops Day Shift Summary

TITLE: 05/15 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Alignment continued in HAM2 today after the Kobelco unit was worked on this morning. Ibrahim has been tidying up around the test stand area and wrapping up parts from the BSFM. Robert continued grounding studies at End X, and Jeff worked in the optics lab on SPI. His work requires leaving the laser running over the weekend in the optics lab; curtain is closed and proper signage is up.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:43 SAF LASER HAZARD LVEA YES LVEA IS LASER HAZARD Ongoing
14:59 VAC Jordan LVEA - Check covers/RGA, shut down Kobelco 15:11
15:32 FAC Kim LVEA - Technical cleaning 17:02
15:41 SPI Jeff Opt Lab Local SPI prep work 19:33
16:25 VAC Jordan LVEA - Checking RGA 16:30
16:39 FAC Randy LVEA - Plugging in equipment 17:31
16:40 SUS Ibrahim LVEA - BSFM housekeeping 19:21
17:20 FAC Kim LVEA - Technical cleaning 18:00
17:41 ISC Keita LVEA Y HAM2 beam alignment 17:55
17:55 PEM Robert EX N Grounding studies (in/out all day) Ongoing
17:58 VAC Jordan LVEA - Ramping up RGA temp 18:04
19:47 ISC Keita LVEA Y HAM2 beam alignment 21:42
20:40 VAC Jordan LVEA - Checking RGA 20:45
21:32 SPI Jeff Opt Lab Local SPI prep work 22:57
21:49 SUS Ibrahim LVEA - BSFM wrap, bag, tag Ongoing
22:38 EPO Oli +2 LVEA - Tour Ongoing
23:05 VAC Jordan LVEA - End-of-day RGA check 23:10
LHO General
ryan.short@LIGO.ORG - posted 07:42, Friday 15 May 2026 (90252)
Ops Day Shift Start

TITLE: 05/15 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 6mph Gusts, 3mph 3min avg
    Primary useism: 0.06 μm/s
    Secondary useism: 0.13 μm/s 
QUICK SUMMARY: Work in HAM2 continues today as part of the ISS swap, but not until the Kobelco unit has had some maintenance done this morning. No in-chamber work allowed until that's finished. 31 disconnected channels on the EDC since the corner HEPI pump controller appears to still be down.

In other news, a M6.7 EQ out of Japan is rolling through, and it's a beautiful morning on-site.

LHO General
corey.gray@LIGO.ORG - posted 16:30, Thursday 14 May 2026 (90242)
Thurs DAY Ops Summary

TITLE: 05/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Cement truck convoy day for CEBEX today.  Bigger BeamSplitter "captured" in the suspension assy & FARO-ed in the afternoon.  A couple big middle school tours.  ISS Array alignment continued.
LOG:

LHO General
corey.gray@LIGO.ORG - posted 07:34, Thursday 14 May 2026 (90241)
Thurs DAY Ops Transition

TITLE: 05/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 5mph Gusts, 3mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.23 μm/s 
QUICK SUMMARY:

New ISS Array alignment will continue as well as work with the new Bigger BeamSplitter. 

No alarms overnight. Clearer & calmer weather this morning.

With the better weather, perhaps the DGR subcontractors will start pouring concrete for the CEBEX walls today (this will require the main gate to be left open for the cement trucks to roll through.  (WP# 13250)

LHO General
corey.gray@LIGO.ORG - posted 16:30, Wednesday 13 May 2026 (90222)
Wed DAY Ops Summary

TITLE: 05/13 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

ISS PD Array and BBSS work continues.  Had a couple of big school field trip visits.

Odd weather day with fairly high winds and rain for most of the day.
LOG:

LHO General
corey.gray@LIGO.ORG - posted 07:36, Wednesday 13 May 2026 (90221)
Wed DAY Ops Transition

TITLE: 05/13 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 19mph Gusts, 13mph 3min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.10 μm/s 
QUICK SUMMARY:

ISS PD Array + LVEA Laser Hazard will continue.  BBSS work continues at the Test Stand.

Rainy & windy morning (just had quick wind storm with gusts reaching almost 50mph just passed...forecast is for a windy day).

LHO General (OpsInfo)
thomas.shaffer@LIGO.ORG - posted 16:30, Tuesday 12 May 2026 (90209)
Ops Day Shift End

TITLE: 05/12 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
SHIFT SUMMARY: The BS suspension was removed from the ISI that it hung from today. The LVEA continues to be in laser hazard for the ISS swap work, which will continue on for another day or so. Alignment trends attached, no surprises with the ongoing ISS work.

Operators - It looks like the LVEA temperature has been trending up over the last week (see screenshot). We should keep an eye on this to verify that it comes back.


LOG:                                                                                                                                                     

Start Time System Name Location Lazer_Haz Task Time End
19:43 SAF LVEA IS LASER HAZARD LVEA Y LVEA IS LASER HAZARD 12:03
15:14 FAC Kim LVEA yes Tech clean 17:05
15:17 IAS Ryan C LVEA yes Warm up Faro 15:33
15:20 FAC Randy LVEA yes Setting up lights at test stand 15:58
16:05 FAC Randy LVEA yes Prep and setup 16:36
16:20 SUS Betsy, Rahul LVEA yes BBS bonding and sus prep 18:46
16:27 SAF Keita LVEA YES Opening light pipe 16:44
16:31 FAC Chris MY n Bringing battery charger 17:31
17:01 SUS Ibrahim LVEA yes BBS work 18:56
17:03 SUS Randy LVEA yes Assist with BBS 18:38
17:17 PEM Robert EX n Magnetic coupling investigation 19:31
17:31 SEI Jim, Michael, Shoshana LVEA yes Moving CRS into the H2 PSL enclosure 19:03
17:34 IAS Jason, Ryan C, Stephen LVEA yes Monument search and error hunt 19:56
17:54 FAC Kim LVEA yes Tech clean 18:48
19:32 SPI Jeff Opt Lab n SPI assembly 21:56
19:33 SUS Ibrahim LVEA yes BBS work 22:03
19:43 SUS Randy LVEA yes BBS work 22:03
19:46 SUS Betsy LVEA yes BBS work 22:03
19:57 CDS Marc, Josh LVEA yes SUS R2 rack testing out SPI electronics 21:42
20:27 SUS Rahul LVEA yes BBS work 20:35
20:28 SUS Travis LVEA yes Bringing out hardware 20:33
20:50 FAC Tyler LVEA yes Inspect scaffolding 21:05
21:02 NCAL Tony, Michael, Shoshana EX n Spin up NCAL 22:13
21:05 SEI Mitchell ends n HEPI FAMIS checks 21:46
21:22 PEM Robert EX n Magnetic coupling invesitgation cont. 23:23
22:28 SEI Jim, Michael, Shoshana LVEA y H2  anteroom CRS build (M & S out @2300) 23:07
Images attached to this report
LHO General
thomas.shaffer@LIGO.ORG - posted 07:35, Tuesday 12 May 2026 (90208)
Ops Day Shift Start

TITLE: 05/12 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 4mph Gusts, 1mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.09 μm/s 
QUICK SUMMARY: IPC errors on h1susMC2 and h1seiproc, dackill on h1iopseib2. All sus aligned and damped except PR2 which is in safe (looking into this), SEI in state captured by the whiteboard. Temps look good and dust counts look good in the LVEA. More laser hazard work planned for the day in the LVEA.

LHO General
thomas.shaffer@LIGO.ORG - posted 16:39, Monday 11 May 2026 (90197)
Ops Day Shift End

TITLE: 05/11 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
SHIFT SUMMARY: The LVEA is still in laser hazard and will be for a few more days. The IMC alignment continues to prove difficult to get right. ITMY IAS finished up today. BBS work continues, CP1 regen, and more!
LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:43 SAF LVEA IS LASER HAZARD LVEA Y LVEA IS LASER HAZARD 12:03
15:07 VAC Jordan LVEA yes Checking on pumps and RGAs 15:17
15:27 CC Ryan C LVEA yes Grab dust monitor 15:42
15:43 FAC Kim LVEA yes Tech clean 17:13
16:26 ISC Keita LVEA YES HAM2/3 IMC alignment troubleshooting 18:20
16:27 ISC Jenne LVEA YES HAM2/3 IMC alignment troubleshooting 17:03
16:27 FAC Randy LVEA yes Measurements for more platforms around BSC3 area and emod area 16:47
16:29 IAS Jason, Ryan C, Stephen A LVEA yes ITMY Faroing in beir garten 20:16
17:15 VAC Jordan LVEA yes CP1 checks 18:25
17:36 FAC Kim LVEA yes Tech clean 18:19
17:49 VAC Travis LVEA yes CP1 work 18:31
18:17 SUS Betsy, Ibrahim LVEA yes BBS first contacting, suspension prep 19:50
20:06 SYS Betsy LVEA yes Checking that a chassis was turned back on 20:12
20:07 SAF Ryan S LVEA yes Checking on door 20:17
20:38 TCS TJ, Madi EX Y HWS table work 23:20
20:40 VAC Jordan LVEA yes HAM4 RGA 22:48
20:42 SUS Betsy, Ibrahim, Rahul LVEA yes BBS magnet gluing 23:42
21:13 ISC Keita LVEA YES HAM2 alignment 21:50
21:21 EE Fil LVEA yes HAM6 rack cabling 00:21
21:36 CAL Tony EX - Spinning up NCal 21:36
21:48 SPI Jeff Opt Lab n SPI work 23:03
22:19 SUS Oli CER n Taking rack pictures 22:23
22:25 PEM Robert EX n Grounding studies 00:25
22:49 VAC Jordan, Gerardo, Travis LVEA yes CP1 regen work 00:49
23:09 SEI Jim, Michael, Shoshana, Stephen LVEA yes Looking at cartridge and BSC2 01:09
LHO General
thomas.shaffer@LIGO.ORG - posted 07:37, Monday 11 May 2026 (90195)
Ops Day Shift Start

TITLE: 05/11 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 10mph Gusts, 6mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.12 μm/s 
QUICK SUMMARY: IPC errors on h1susMC2 and h1seiproc, dackill on h1iopseib2. All sus aligned and damped, SEI in state captured by the whiteboard. Temps look good and dust counts look good in the LVEA, the ends saw counts up into the 2000s during the last bout of wind 12 hours ago.

Laser hazard work in the LVEA continues today.

LHO General
corey.gray@LIGO.ORG - posted 16:34, Friday 08 May 2026 (90167)
Fri Ops DAY Shift Summary

TITLE: 05/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

MC2 was fixed (cabling issue---see their alog).  ISS team went out to HAM2 late this afternoon.
LOG:

LHO General
corey.gray@LIGO.ORG - posted 07:48, Friday 08 May 2026 (90166)
Fri Ops Day Transition

TITLE: 05/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 4mph Gusts, 2mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.09 μm/s 
QUICK SUMMARY:

ISS Array work continues...MC2 troubleshooting continues.

LHO General
thomas.shaffer@LIGO.ORG - posted 16:30, Wednesday 06 May 2026 - last comment - 15:37, Friday 08 May 2026(90146)
Ops Day Shift End

TITLE: 05/06 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
SHIFT SUMMARY: Lots of work being done in the LVEA. Scaffolding was erected around GV7, the BBS is here and getting magnets bonded and cleaned, the IAS team is finishing final shots on the old BS, CP1 is still warm, SPI plate was put onto HAM2, and more!
LOG: 

Start Time System Name Location Lazer_Haz Task Time End
14:51 FAC Kim LVEA n Tech clean 16:42
15:17 FAC/VAC Randy LVEA n Prep for scaffold build around GV7 18:56
15:31 FAC/VAC Eric LVEA n GV7 scaffold build 18:56
15:38 FAC/VAC Chris LVEA n GV7 scaffolding build 18:56
15:59 VAC Jordan LVEA n Check on CP1 and HAM6 RGA 16:07
16:16 ISC Elenna Opt lab n OMC BHSS work 17:52
16:43 SPI Jeff Opt Lab, LVEA n SPI ISIJ board install 19:34
16:47 PEM Robert, Jim LVEA n HAM2/3 chamber work and contamination checks 19:27
17:01 SUS Oli CR/LVEA n BS health check 17:52
17:16 FAC Kim LVEA n Tech clean 17:54
17:16 IAS/SUS Betsy, Jason, Ryan C, Stephen, Rahul, Ibrahim LVEA n IAS and SUS work (Betsy out @ 1910, Ibrahim/Rahul out 1930) 20:44
17:25 CDS Erik CER n CDS laptops 17:29
18:43 - Richard LVEA n Check in on crews 18:45
19:59 CDS Fil, Jackie MER, LVEA n MER cleanup, HAM6 rack work 22:30
20:00 VAC Gerardo LVEA n Check on CP1 20:45
20:09 VAC Jordan LVEA n CS RGA work (HAM4 area +X) 22:05
20:33 SUS Rahul, Ibrahim LVEA n BBS bonding (Rahul out @ 23:26) 00:07
20:37 SUS Betsy LVEA n BBS and IAS check ins 20:44
20:39 FAC Randy LVEA n Cleanup around GV7 area 21:46
20:53 VAC Gerardo LVEA n Joining Jordan with the RGA 22:05
21:02 SUS Betsy LVEA n BBS work 23:58
21:02 CDS/SEI Patrick MER n Reimaging HEPI computer 22:26
21:06 - Richard LVEA n Check on crews 21:46
21:23 ISC Elenna, Oli Opt Lab YES BHSS OMC testing 00:23
21:24 TCS Camilla LVEA, Opt Lab n Clean up 21:30
21:45 IAS Jason, Ryan C, Stephen LVEA n BS alignment 00:45
21:46 SUS Tom LVEA n Check in with BBS crew 21:53
22:00 PEM Robert LVEA n HAM2/3 pictures and stray light 23:18
22:10 PEM Tony LVEA n HAM2/3 23:18
23:22 PCAL Tony PCAL lab n Retrieving beam profiler 00:22
Comments related to this report
gerardo.moreno@LIGO.ORG - 15:37, Friday 08 May 2026 (90187)VE

(Randy T., Chris S., Eric O.)

Facilities set the scaffolding at GV7, the temporary work platform is set about 1 foot above the gate valve's bonnet, leaving clearance for all annulus pipes and other accessories.

Images attached to this comment
LHO General
eric.otterman@LIGO.ORG - posted 12:42, Wednesday 06 May 2026 (90137)
Mid station chillers
The chillers have been turned on at the mid stations for the season. 
LHO General
thomas.shaffer@LIGO.ORG - posted 07:40, Wednesday 06 May 2026 (90133)
Ops Day Shift Start

TITLE: 05/06 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 4mph Gusts, 2mph 3min avg
    Primary useism: 0.18 μm/s
    Secondary useism: 0.23 μm/s 
QUICK SUMMARY: Currently riding out a 5.8 earthquake from the Aleutians. No new alarms, CDS overview has expected errors in: h1iopsusb2h34, h1suslo12-bbss, h1iopseib2. and h1seiproc has an IPC error.