Search criteria
Section: LHO
Task: General
TITLE: 05/19 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: More alignment work in HAM2 and BBSS alignment today. Now that the LVEA is back to Laser SAFE, more alignment steps for the BBSS and prep for the GV7 repair can be done starting tomorrow. The SPI NPRO continues to run overnight in the optics lab with proper curtains and signage in place.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 19:43 | SAF | LASER HAZARD | LVEA | YES | LVEA IS LASER HAZARD | 23:11 |
| 14:43 | FAC | Kim | LVEA | - | Technical cleaning | 16:15 |
| 15:37 | SUS | Betsy | LVEA | - | Looking for parts | 15:51 |
| 15:49 | VAC | Jordan | LVEA | - | Pump checks | 15:56 |
| 15:49 | SUS | Ibrahim | LVEA | - | BBSS staging | 19:32 |
| 16:20 | SUS | Betsy | LVEA | - | BBSS staging | 17:47 |
| 16:30 | PEM | Ryan C | LVEA | - | Setting up DM at test stand | 16:46 |
| 16:34 | FAC | Kim | LVEA | - | Technical cleaning | 17:21 |
| 17:41 | VAC | Jordan +1 | EX, MX, EY, MY | - | N2 tank inspections | 20:22 |
| 17:52 | SUS | Betsy | LVEA | - | BBSS staging | 19:33 |
| 18:31 | SUS | Oli | LVEA/Opt Lab | - | Grabbing parts and delivering | 19:29 |
| 19:29 | SPI | Josh | LVEA | - | Checking cable | 19:37 |
| 20:26 | VAC | Travis | LVEA | - | HAM3 feedthrus | 21:23 |
| 20:28 | SUS | Betsy | LVEA | - | BBSS work | 22:48 |
| 20:29 | IAS | Jason, Ryan C | LVEA | - | BBSS surveying setup | 22:48 |
| 20:33 | SUS | Corey | Opt/Prep Labs | - | Looking for parts | 20:58 |
| 20:35 | SEI | Jim | LVEA | - | HAM3 feedthrus | 21:24 |
| 20:46 | SAF | Richard | LVEA | - | Safety checks | 21:15 |
| 20:48 | ISC | Keita | LVEA | Y | HAM2 beam alignment | 22:53 |
| 20:52 | ISC | Elenna | LVEA | Y | HAM2 beam alignment | 22:53 |
| 20:54 | SEI | Shoshana | LVEA | - | HAM3 feedthrus | 21:24 |
| 21:06 | SPI | Jeff | Opt Lab | Local | SPI alignment (working late) | Ongoing |
| 21:18 | EE | Fil | MER | - | HEPI electronics | 23:18 |
| 21:33 | CAL | Tony | PCal Lab | Local | Set up measurement | 22:32 |
| 21:33 | SUS | Ibrahim | LVEA | - | BBSS work | 22:35 |
| 22:21 | SEI | Jim | LVEA | - | Getting boxes from H2 PSL | 22:27 |
| 22:58 | SAF | Oli | LVEA | - | Transitioning to Laser SAFE | 23:10 |
TITLE: 05/19 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 4mph Gusts, 1mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.19 μm/s
QUICK SUMMARY: No alarms overnight, temperatures and dust counts looking normal. More alignment work in HAM2 planned for today along with continued prep on the BBSS in the LVEA west bay. CR workstations and wall FOMs are finishing their restarts.
TITLE: 05/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Alignment work continued in HAM2 today, along with more prep of the BBSS and IAS surveying on the test stand. Since SPI alignment is ongoing on the optics lab, the laser remains on and running unattended with appropriate barriers and signage up.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 19:43 | SAF | LASER HAZARD | LVEA | YES | LVEA IS LASER HAZARD | Ongoing |
| 14:50 | FAC | Kim | LVEA | - | Technical cleaning | 16:09 |
| 15:19 | VAC | Jordan | LVEA | - | Pump checks | 15:26 |
| 15:55 | FAC | Randy, Jeff | LVEA | - | Moving IOT2L a little | 16:16 |
| 15:55 | SPI | Jeff | Opt Lab | Local | SPI prep | 18:28 |
| 16:29 | IAS | Jason, Ryan C | LVEA | - | BS FARO surveying | 19:55 |
| 16:30 | ISC | Keita | LVEA | - | Opening lightpipe | 16:44 |
| 16:46 | SUS | Betsy, Ibrahim | LVEA | - | BBSS work | 18:34 |
| 16:52 | TCS | TJ | LVEA | - | Checking on TCSY water lines | 17:10 |
| 17:09 | SUS | Randy | LVEA | - | BBSS work | 20:09 |
| 17:18 | SPI | Josh | LVEA | - | SPI work at SUS-R2 | 18:32 |
| 18:04 | ISC | Keita | LVEA | Y | HAM2 beam alignment | 18:28 |
| 19:26 | SPI | Jeff | Opt Lab | Local | SPI alignment | 21:53 |
| 19:37 | ISC | Keita | LVEA | Y | HAM2 beam alignment | 19:47 |
| 20:10 | SEI | Fil | MER | n | HEPI electronics work | Ongoing |
| 20:10 | SPI | Josh | LVEA | - | SPI work at SUS-R2 | Ongoing |
| 20:11 | SUS | Betsy, Ibrahim | LVEA | - | BBSS work | Ongoing |
| 20:28 | SUS | Randy | LVEA | - | BBSS work | 21:38 |
| 21:06 | IAS | Jason, Ryan C | LVEA | - | BS FARO surveying | Ongoing |
| 22:24 | ISC | Keita | Opt Lab | - | Looking for parts | 23:02 |
| 22:44 | ISC | Rahul | Opt Lab | - | Looking for parts | 23:02 |
| 23:03 | ISC | Keita, Rahul | LVEA | Y | HAM2 beam alignment | Ongoing |
TITLE: 05/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 12mph Gusts, 6mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.15 μm/s
QUICK SUMMARY: No alarms over the weekend, temperatures looking normal, dust counts low as well. The same 31 channels are disconnected from the EDC since the CS HEPI pump controller is still down.
Likely continuing with alignment work in HAM2 today following the ISS array replacement.
TITLE: 05/15 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Alignment continued in HAM2 today after the Kobelco unit was worked on this morning. Ibrahim has been tidying up around the test stand area and wrapping up parts from the BSFM. Robert continued grounding studies at End X, and Jeff worked in the optics lab on SPI. His work requires leaving the laser running over the weekend in the optics lab; curtain is closed and proper signage is up.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 19:43 | SAF | LASER HAZARD | LVEA | YES | LVEA IS LASER HAZARD | Ongoing |
| 14:59 | VAC | Jordan | LVEA | - | Check covers/RGA, shut down Kobelco | 15:11 |
| 15:32 | FAC | Kim | LVEA | - | Technical cleaning | 17:02 |
| 15:41 | SPI | Jeff | Opt Lab | Local | SPI prep work | 19:33 |
| 16:25 | VAC | Jordan | LVEA | - | Checking RGA | 16:30 |
| 16:39 | FAC | Randy | LVEA | - | Plugging in equipment | 17:31 |
| 16:40 | SUS | Ibrahim | LVEA | - | BSFM housekeeping | 19:21 |
| 17:20 | FAC | Kim | LVEA | - | Technical cleaning | 18:00 |
| 17:41 | ISC | Keita | LVEA | Y | HAM2 beam alignment | 17:55 |
| 17:55 | PEM | Robert | EX | N | Grounding studies (in/out all day) | Ongoing |
| 17:58 | VAC | Jordan | LVEA | - | Ramping up RGA temp | 18:04 |
| 19:47 | ISC | Keita | LVEA | Y | HAM2 beam alignment | 21:42 |
| 20:40 | VAC | Jordan | LVEA | - | Checking RGA | 20:45 |
| 21:32 | SPI | Jeff | Opt Lab | Local | SPI prep work | 22:57 |
| 21:49 | SUS | Ibrahim | LVEA | - | BSFM wrap, bag, tag | Ongoing |
| 22:38 | EPO | Oli +2 | LVEA | - | Tour | Ongoing |
| 23:05 | VAC | Jordan | LVEA | - | End-of-day RGA check | 23:10 |
TITLE: 05/15 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 6mph Gusts, 3mph 3min avg
Primary useism: 0.06 μm/s
Secondary useism: 0.13 μm/s
QUICK SUMMARY: Work in HAM2 continues today as part of the ISS swap, but not until the Kobelco unit has had some maintenance done this morning. No in-chamber work allowed until that's finished. 31 disconnected channels on the EDC since the corner HEPI pump controller appears to still be down.
In other news, a M6.7 EQ out of Japan is rolling through, and it's a beautiful morning on-site.
TITLE: 05/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Cement truck convoy day for CEBEX today. Bigger BeamSplitter "captured" in the suspension assy & FARO-ed in the afternoon. A couple big middle school tours. ISS Array alignment continued.
LOG:
TITLE: 05/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 5mph Gusts, 3mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.23 μm/s
QUICK SUMMARY:
New ISS Array alignment will continue as well as work with the new Bigger BeamSplitter.
No alarms overnight. Clearer & calmer weather this morning.
With the better weather, perhaps the DGR subcontractors will start pouring concrete for the CEBEX walls today (this will require the main gate to be left open for the cement trucks to roll through. (WP# 13250)
TITLE: 05/13 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
ISS PD Array and BBSS work continues. Had a couple of big school field trip visits.
Odd weather day with fairly high winds and rain for most of the day.
LOG:
TITLE: 05/13 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 19mph Gusts, 13mph 3min avg
Primary useism: 0.04 μm/s
Secondary useism: 0.10 μm/s
QUICK SUMMARY:
ISS PD Array + LVEA Laser Hazard will continue. BBSS work continues at the Test Stand.
Rainy & windy morning (just had quick wind storm with gusts reaching almost 50mph just passed...forecast is for a windy day).
TITLE: 05/12 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
SHIFT SUMMARY: The BS suspension was removed from the ISI that it hung from today. The LVEA continues to be in laser hazard for the ISS swap work, which will continue on for another day or so. Alignment trends attached, no surprises with the ongoing ISS work.
Operators - It looks like the LVEA temperature has been trending up over the last week (see screenshot). We should keep an eye on this to verify that it comes back.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 19:43 | SAF | LVEA IS LASER HAZARD | LVEA | Y | LVEA IS LASER HAZARD | 12:03 |
| 15:14 | FAC | Kim | LVEA | yes | Tech clean | 17:05 |
| 15:17 | IAS | Ryan C | LVEA | yes | Warm up Faro | 15:33 |
| 15:20 | FAC | Randy | LVEA | yes | Setting up lights at test stand | 15:58 |
| 16:05 | FAC | Randy | LVEA | yes | Prep and setup | 16:36 |
| 16:20 | SUS | Betsy, Rahul | LVEA | yes | BBS bonding and sus prep | 18:46 |
| 16:27 | SAF | Keita | LVEA | YES | Opening light pipe | 16:44 |
| 16:31 | FAC | Chris | MY | n | Bringing battery charger | 17:31 |
| 17:01 | SUS | Ibrahim | LVEA | yes | BBS work | 18:56 |
| 17:03 | SUS | Randy | LVEA | yes | Assist with BBS | 18:38 |
| 17:17 | PEM | Robert | EX | n | Magnetic coupling investigation | 19:31 |
| 17:31 | SEI | Jim, Michael, Shoshana | LVEA | yes | Moving CRS into the H2 PSL enclosure | 19:03 |
| 17:34 | IAS | Jason, Ryan C, Stephen | LVEA | yes | Monument search and error hunt | 19:56 |
| 17:54 | FAC | Kim | LVEA | yes | Tech clean | 18:48 |
| 19:32 | SPI | Jeff | Opt Lab | n | SPI assembly | 21:56 |
| 19:33 | SUS | Ibrahim | LVEA | yes | BBS work | 22:03 |
| 19:43 | SUS | Randy | LVEA | yes | BBS work | 22:03 |
| 19:46 | SUS | Betsy | LVEA | yes | BBS work | 22:03 |
| 19:57 | CDS | Marc, Josh | LVEA | yes | SUS R2 rack testing out SPI electronics | 21:42 |
| 20:27 | SUS | Rahul | LVEA | yes | BBS work | 20:35 |
| 20:28 | SUS | Travis | LVEA | yes | Bringing out hardware | 20:33 |
| 20:50 | FAC | Tyler | LVEA | yes | Inspect scaffolding | 21:05 |
| 21:02 | NCAL | Tony, Michael, Shoshana | EX | n | Spin up NCAL | 22:13 |
| 21:05 | SEI | Mitchell | ends | n | HEPI FAMIS checks | 21:46 |
| 21:22 | PEM | Robert | EX | n | Magnetic coupling invesitgation cont. | 23:23 |
| 22:28 | SEI | Jim, Michael, Shoshana | LVEA | y | H2 anteroom CRS build (M & S out @2300) | 23:07 |
TITLE: 05/12 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 4mph Gusts, 1mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.09 μm/s
QUICK SUMMARY: IPC errors on h1susMC2 and h1seiproc, dackill on h1iopseib2. All sus aligned and damped except PR2 which is in safe (looking into this), SEI in state captured by the whiteboard. Temps look good and dust counts look good in the LVEA. More laser hazard work planned for the day in the LVEA.
TITLE: 05/11 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
SHIFT SUMMARY: The LVEA is still in laser hazard and will be for a few more days. The IMC alignment continues to prove difficult to get right. ITMY IAS finished up today. BBS work continues, CP1 regen, and more!
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 19:43 | SAF | LVEA IS LASER HAZARD | LVEA | Y | LVEA IS LASER HAZARD | 12:03 |
| 15:07 | VAC | Jordan | LVEA | yes | Checking on pumps and RGAs | 15:17 |
| 15:27 | CC | Ryan C | LVEA | yes | Grab dust monitor | 15:42 |
| 15:43 | FAC | Kim | LVEA | yes | Tech clean | 17:13 |
| 16:26 | ISC | Keita | LVEA | YES | HAM2/3 IMC alignment troubleshooting | 18:20 |
| 16:27 | ISC | Jenne | LVEA | YES | HAM2/3 IMC alignment troubleshooting | 17:03 |
| 16:27 | FAC | Randy | LVEA | yes | Measurements for more platforms around BSC3 area and emod area | 16:47 |
| 16:29 | IAS | Jason, Ryan C, Stephen A | LVEA | yes | ITMY Faroing in beir garten | 20:16 |
| 17:15 | VAC | Jordan | LVEA | yes | CP1 checks | 18:25 |
| 17:36 | FAC | Kim | LVEA | yes | Tech clean | 18:19 |
| 17:49 | VAC | Travis | LVEA | yes | CP1 work | 18:31 |
| 18:17 | SUS | Betsy, Ibrahim | LVEA | yes | BBS first contacting, suspension prep | 19:50 |
| 20:06 | SYS | Betsy | LVEA | yes | Checking that a chassis was turned back on | 20:12 |
| 20:07 | SAF | Ryan S | LVEA | yes | Checking on door | 20:17 |
| 20:38 | TCS | TJ, Madi | EX | Y | HWS table work | 23:20 |
| 20:40 | VAC | Jordan | LVEA | yes | HAM4 RGA | 22:48 |
| 20:42 | SUS | Betsy, Ibrahim, Rahul | LVEA | yes | BBS magnet gluing | 23:42 |
| 21:13 | ISC | Keita | LVEA | YES | HAM2 alignment | 21:50 |
| 21:21 | EE | Fil | LVEA | yes | HAM6 rack cabling | 00:21 |
| 21:36 | CAL | Tony | EX | - | Spinning up NCal | 21:36 |
| 21:48 | SPI | Jeff | Opt Lab | n | SPI work | 23:03 |
| 22:19 | SUS | Oli | CER | n | Taking rack pictures | 22:23 |
| 22:25 | PEM | Robert | EX | n | Grounding studies | 00:25 |
| 22:49 | VAC | Jordan, Gerardo, Travis | LVEA | yes | CP1 regen work | 00:49 |
| 23:09 | SEI | Jim, Michael, Shoshana, Stephen | LVEA | yes | Looking at cartridge and BSC2 | 01:09 |
TITLE: 05/11 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 10mph Gusts, 6mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.12 μm/s
QUICK SUMMARY: IPC errors on h1susMC2 and h1seiproc, dackill on h1iopseib2. All sus aligned and damped, SEI in state captured by the whiteboard. Temps look good and dust counts look good in the LVEA, the ends saw counts up into the 2000s during the last bout of wind 12 hours ago.
Laser hazard work in the LVEA continues today.
TITLE: 05/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
MC2 was fixed (cabling issue---see their alog). ISS team went out to HAM2 late this afternoon.
LOG:
TITLE: 05/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 4mph Gusts, 2mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.09 μm/s
QUICK SUMMARY:
ISS Array work continues...MC2 troubleshooting continues.
TITLE: 05/06 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
SHIFT SUMMARY: Lots of work being done in the LVEA. Scaffolding was erected around GV7, the BBS is here and getting magnets bonded and cleaned, the IAS team is finishing final shots on the old BS, CP1 is still warm, SPI plate was put onto HAM2, and more!
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:51 | FAC | Kim | LVEA | n | Tech clean | 16:42 |
| 15:17 | FAC/VAC | Randy | LVEA | n | Prep for scaffold build around GV7 | 18:56 |
| 15:31 | FAC/VAC | Eric | LVEA | n | GV7 scaffold build | 18:56 |
| 15:38 | FAC/VAC | Chris | LVEA | n | GV7 scaffolding build | 18:56 |
| 15:59 | VAC | Jordan | LVEA | n | Check on CP1 and HAM6 RGA | 16:07 |
| 16:16 | ISC | Elenna | Opt lab | n | OMC BHSS work | 17:52 |
| 16:43 | SPI | Jeff | Opt Lab, LVEA | n | SPI ISIJ board install | 19:34 |
| 16:47 | PEM | Robert, Jim | LVEA | n | HAM2/3 chamber work and contamination checks | 19:27 |
| 17:01 | SUS | Oli | CR/LVEA | n | BS health check | 17:52 |
| 17:16 | FAC | Kim | LVEA | n | Tech clean | 17:54 |
| 17:16 | IAS/SUS | Betsy, Jason, Ryan C, Stephen, Rahul, Ibrahim | LVEA | n | IAS and SUS work (Betsy out @ 1910, Ibrahim/Rahul out 1930) | 20:44 |
| 17:25 | CDS | Erik | CER | n | CDS laptops | 17:29 |
| 18:43 | - | Richard | LVEA | n | Check in on crews | 18:45 |
| 19:59 | CDS | Fil, Jackie | MER, LVEA | n | MER cleanup, HAM6 rack work | 22:30 |
| 20:00 | VAC | Gerardo | LVEA | n | Check on CP1 | 20:45 |
| 20:09 | VAC | Jordan | LVEA | n | CS RGA work (HAM4 area +X) | 22:05 |
| 20:33 | SUS | Rahul, Ibrahim | LVEA | n | BBS bonding (Rahul out @ 23:26) | 00:07 |
| 20:37 | SUS | Betsy | LVEA | n | BBS and IAS check ins | 20:44 |
| 20:39 | FAC | Randy | LVEA | n | Cleanup around GV7 area | 21:46 |
| 20:53 | VAC | Gerardo | LVEA | n | Joining Jordan with the RGA | 22:05 |
| 21:02 | SUS | Betsy | LVEA | n | BBS work | 23:58 |
| 21:02 | CDS/SEI | Patrick | MER | n | Reimaging HEPI computer | 22:26 |
| 21:06 | - | Richard | LVEA | n | Check on crews | 21:46 |
| 21:23 | ISC | Elenna, Oli | Opt Lab | YES | BHSS OMC testing | 00:23 |
| 21:24 | TCS | Camilla | LVEA, Opt Lab | n | Clean up | 21:30 |
| 21:45 | IAS | Jason, Ryan C, Stephen | LVEA | n | BS alignment | 00:45 |
| 21:46 | SUS | Tom | LVEA | n | Check in with BBS crew | 21:53 |
| 22:00 | PEM | Robert | LVEA | n | HAM2/3 pictures and stray light | 23:18 |
| 22:10 | PEM | Tony | LVEA | n | HAM2/3 | 23:18 |
| 23:22 | PCAL | Tony | PCAL lab | n | Retrieving beam profiler | 00:22 |
The chillers have been turned on at the mid stations for the season.
TITLE: 05/06 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 4mph Gusts, 2mph 3min avg
Primary useism: 0.18 μm/s
Secondary useism: 0.23 μm/s
QUICK SUMMARY: Currently riding out a 5.8 earthquake from the Aleutians. No new alarms, CDS overview has expected errors in: h1iopsusb2h34, h1suslo12-bbss, h1iopseib2. and h1seiproc has an IPC error.