Reports until 16:01, Tuesday 13 June 2023
H1 General (SQZ)
camilla.compton@LIGO.ORG - posted 16:01, Tuesday 13 June 2023 - last comment - 09:24, Thursday 15 June 2023(70413)
OPS Day Shift Summary

TITLE: 06/13 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 131Mpc
SHIFT SUMMARY: Easy relock after Tuesday Maintenance but the wind is forecasts\ to pick up this evening.
LOG:

There is a computer Patrick left  turned on in the EY Mech room on HEPI pump controller, Robert powered off the monitor but said that he has previously done research that new style LED monitors are less nosy than computers.                                                                                                        

Start Time System Name Location Lazer_Haz Task Time End
13:14 CDS Erik Remote N Restarting NUCs OPSLogin0 13:22
14:24 FAC Tyler MidY N Slowly move snorkle lift to MidY 15:10
15:00 PCAL Tony PCAL lab then CER N PCAL measurement prep 15:27
15:00 FAC Karen EndY N Technical Cleaning 16:01
15:07 FAC Bubba Air Handler Room N Fans alog 70404 17:07
15:09 VAC Travis, EX, MX N Monthly Turbo Pump Checks 17:54
15:14 FAC Tyler OSB Recieving N Forklift Move 15:15
15:15 COMM Sheila, Jason LVEA N PSL Racks - turn off sidebands 15:25
15:16 PCAL Rick, Tony, Julianna EX YES PCAL Measurement, WP 11253 17:40
15:17 FAC Kim EX YES Technical Cleaning 16:17
15:22 PSL Jason CR N Touch up RevCav Alginment alog70402 16:12
15:23 EE Fil, Patrick EY N New HEPI Beckhoff,   Jim turned off HEPI 19:06
15:31 COMM Sheila CR N Prep for OMC scans and OMc scans (ETMs misaligned) alog 70409 17:44
15:36 SEI (Jim) EY N EY HEPI offline 19:17
15:44 CDS WAP All buildings N WAP turned on 19:17
15:50 COMM Daniel LVEA/CER N PSL Racks turn off 117MHz sideband 15:58
16:26 FAC Karen, Kim FCES N Technical Cleaning 17:19
16:29 SEI Jim FCES n Feedthrough protection 17:24
16:54 EE Marc CER Mezz, EX, EY N Check on Kepco Power supplys (not in VEAs) 19:04
17:40 EPO Mike + 12 LVEA N Tour 18:13
17:43 VAC Gerardo FCES N length measurements - cables and pipes 18:18
17:43 COMM Shiela LVEA N Turn on RF sidebands 17:54
17:45 VAC Janos, Jordan LVEA, EY, EY N Labeling Equipment 18:57
17:46 OPS Tony EX N Dust Moniter Pump Replacement 18:54
18:13 Tour Rick + 5 LVEA N Tour 18:55
18:26 PEM Robert, Bubba EX N HVAC setup 18:59
18:48 SEI Jim CR N HAM4 TFs 21:06
18:10 SEI Jim EY N Assist with HEPI Beckoff 18:40
18:00 FAC Kim, Karen, Cindy LVEA N Technical Cleaning 18:50
19:05 PCAL Tony PCAL Lab N PCAL lab 19:45
19:07 PEM Robert EY N Get equipment 20:02
19:24   Betsy LVEA N Walkthrough 19:36
19:31 VAC Janos, Jordan Mx, MY N Lableing Equimpent in VEA 19:58
19:40 CDS Dave Remote N als retarts and DAQ restart 19:40
19:52 PEM Robert LVEA N Accelerometers near Oplevs 20:12
21:03 PCAL Tony PCAL Lab N PCAL ongoing
Images attached to this report
Comments related to this report
camilla.compton@LIGO.ORG - 09:24, Thursday 15 June 2023 (70481)

Went out of Observing due to SQZ-OPO_PZT_1 getting to edge of it's range 40-110V. No changes have been made to mitigate this as it only changed so rapidly as the LVEA temperature changed, see 70477.