TITLE: 06/16 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
SHIFT SUMMARY: Shift was full of earthquakes, keeping us down for several hours.
Lock #1:
Lock #2:
Lock #3:
Lock #4:
Lock #5:
Handing off to Corey, H1 currently at MAX_POWER.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:45 | FAC | Karen | Optics/Vac Labs | - | Technical cleaning | 16:05 |
| 16:12 | CAL | Ryan | CR | - | Sensing function calibration meas. | 16:46 |
| 16:56 | CDS | Marc, Jonathan | CER | - | Check on HAM6 camera | 17:06 |
| 17:06 | VAC | Janos | MY | - | Check pump | 17:23 |
| 17:18 | PEM | Robert | LVEA | - | Set up scatter test on HAM3 | 17:23 |
| 18:35 | PEM | Robert | LVEA | - | HAM3 scatter test (Wifi on) | 18:47 |
| 18:47 | FAC | Kim | H2 | - | Technical cleaning | 19:04 |
| 21:27 | VAC | Janos | EX | - | VAC checks | 21:51 |