Ops Day Shift Summary

TITLE: 06/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY: Busy maintenance morning. Locked by early afternoon and now working on some commissioning tasks.

Lock #1:


LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:05 VAC Jordan Mid Y , & EY N Vacuum work 17:44
15:06 FAC Karen EY N Technical Cleaning 16:20
15:07 FAC FAC LVEA N 3 IFO Storage 16:36
15:10 FAC Kim EX N Technical Cleaning 16:20
15:12 FAC Christina Mids & LVEA N 3 IFO Inventory 16:24
15:27 VAC Janos, Gerardo EX, EY N Purge air turn on 17:10
15:37 VAC Travis Mids and Ends N Inventory check on HEPTA pump installs 17:51
15:52 FAC Bubba EX N HVAC fans troubleshooting 18:36
15:55 COMM Daniel LVEA N REFL whitening chassis 17:00
15:55 CDS Fil EY N HEPI beckhoff  (Jim to take EY HEPI down) 17:49
15:56 FAMIS Ryan C LVEA entrance, Optics Lab N Dust monitors, parts drop 16:53
15:58 PSL Jason, Robert LVEA N Walking PSL Water lines 16:19
16:20 PEM Robert EX N fans with Bubba and COMM setup 18:36
16:27 SEI   EX N HEPI accidentally took down (alog70605) 16:59
16:35 WAP wifi All N CDS wifi on (leave MSR on at end of maintance alog70480) 19:21
16:55 FAC Karen, Kim LVEA - Technical cleaning 18:55
16:55 FAC Cindi FCES - Technical cleaning 18:19
16:56 PSL Ryan S, Jason PSL Diode room N Lowering flow rate WP11209 17:26
17:00 COMM Daniel CR N 10W input and ITMs misaligned, looking at REFL 18:33
17:00 SEI Jim EY N HEPI Beckhoff work 18:44
17:01 FAC Tyler LVEA N Battery check 17:07
17:01 CDS Jonathan EX N Check on fans with Bubba 17:32
17:11 VAC Geradro, Janos FCES N VAC tasks 17:44
17:11 CDS Dave Remote N h1lsc model restart and DAQ restart WP11273/11272 (new channels for Daniel) 17:26
17:26 CDS Erik Remote N Restart Seismon server WP11269 18:09
17:32 PEM Ryan C CER - Dust monitors 17:39
17:45 VAC Janos, Gerardo, Jordan Ends, MX - FTIR and labelling 19:13
17:49 CDS Fil LVEA - Check OMC trans camera 18:44
18:11 PSL Jason LVEA - PSL Racks - Checks 18:15
18:23 FAC Tyler LVEA - Unplug equipment 18:30
18:40 TCS Camilla, Rachel Opt Lab - Looking for parts 19:02
19:16 ISC Camilla LVEA - Final sweep 19:42
20:44 PEM Robert EX - Shaking cryobaffle 22:15
22:06 ISC Sheila, Brina, Naoki CR - Noise budget injections Ongoing