WP11273 LSC RIN channels
Daniel, Ryan, Dave:
Installed Daniel's new h1lsc model which adds RIN testpoint channels, making one of them a DAQ fast channel. DAQ restart was required.
Two h1lsc restarts were needed, the second to fix a minor issue with matlab simulink file.
WP11256 Upgrade EY HEPI pump controller to Beckhoff
Fernando, Fil, Jim, Patrick, Ryan, Dave:
The Beckhoff EY HEPI pump controller was activated today and the original "Ben box" was turned off.
The old EY channels were removed from the DAQ and the new channels were added. A DAQ+EDC restart was required.
The h1hpipumpctrlsdf slow controls SDF was updated and restarted on h1ecatmon0.
WP11269 Upgrade Seismon
Jim, Erik, Dave:
Erik installed a new version of seismon. This added 18 channels to the DAQ INI. DAQ+EDC restart was required.
DAQ Restarts
Dave:
The DAQ was restarted twice today. First soon after Daniel's new h1lsc model was installed to add one fast channel to the frame.
The second DAQ restart was coupled with an EDC restart, to add new Seismon channels and the new EY HEPI pump controller channels.
Tue20Jun2023
LOC TIME HOSTNAME MODEL/REBOOT
10:14:46 h1lsc0 h1lsc <<< First h1lsc restart, additional DAQ channel
10:16:07 h1daqdc0 [DAQ] <<< First DAQ restart for LSC
10:16:20 h1daqfw0 [DAQ]
10:16:20 h1daqtw0 [DAQ]
10:16:21 h1daqnds0 [DAQ]
10:16:29 h1daqgds0 [DAQ]
10:17:04 h1daqgds0 [DAQ] <<< gds0 required 2nd restart
10:22:29 h1daqdc1 [DAQ]
10:22:40 h1daqfw1 [DAQ]
10:22:40 h1daqtw1 [DAQ]
10:22:42 h1daqnds1 [DAQ]
10:22:52 h1daqgds1 [DAQ]
10:23:24 h1daqgds1 [DAQ] <<< gds1 required 2nd restart
11:05:54 h1lsc0 h1lsc <<< second restart of LSC for minor model change, this restart failed (see below)
11:11:45 h1lsc0 h1lsc <<< after another round of make/install, this LSC restart succeeded.
11:31:53 h1daqdc0 [DAQ] <<< Second DAQ restart to add SEISMON and HPIPUMPCTRLEY channels to EDD
11:32:05 h1daqfw0 [DAQ]
11:32:05 h1daqnds0 [DAQ]
11:32:05 h1daqtw0 [DAQ]
11:32:13 h1daqgds0 [DAQ]
11:32:30 h1susauxb123 h1edc[DAQ] <<< EDC restart
11:35:03 h1daqdc1 [DAQ]
11:35:15 h1daqfw1 [DAQ]
11:35:16 h1daqtw1 [DAQ]
11:35:18 h1daqnds1 [DAQ]
11:35:26 h1daqgds1 [DAQ]
11:36:30 h1daqgds1 [DAQ] <<< 2nd gds1 restart
The second start of h1lsc (no DAQ change, only a minor model change) failed. The GDS_TP screen had incorrect information, it reported an INI file change even though there was none, and some counters had nonsensical values (e.g. billions of DAQ channels) amost as if counters had been replaced with pointers.
The build/install/stop/start procedure was the same for this restart as the previous and the following restarts. That is to say this was not a super fast restart with an increased possibilty of cached files visible from the NFS server.
After another round of build/installs this model started normally. Why this happened remains a mystery.
DAQ CHANGES
The following channels were REMOVED FROM THE FRAME
H1:HPI-PUMP_EY_BSCRET_PRESS 4 16
< H1:HPI-PUMP_EY_BSCSUP_PRESS 4 16
< H1:HPI-PUMP_EY_CONTROL_VOUT 4 16
< H1:HPI-PUMP_EY_DIFF_PRESS 4 16
< H1:HPI-PUMP_EY_HEARTBEAT 4 16
< H1:HPI-PUMP_EY_HEARTBEAT_OUT 4 16
< H1:HPI-PUMP_EY_LEVEL_ALARM 4 16
< H1:HPI-PUMP_EY_LEVEL_ALARM_OUT 4 16
< H1:HPI-PUMP_EY_LEVEL_SWITCH_ALARM 4 16
< H1:HPI-PUMP_EY_MODE 4 16
< H1:HPI-PUMP_EY_OUT_TWEAK 4 16
< H1:HPI-PUMP_EY_OUT_TWEAKOUT 4 16
< H1:HPI-PUMP_EY_PID 4 16
< H1:HPI-PUMP_EY_PRESSURE_OK 4 16
< H1:HPI-PUMP_EY_PRESSURE_OK_OUT 4 16
< H1:HPI-PUMP_EY_PS_PRESS1 4 16
< H1:HPI-PUMP_EY_PS_PRESS2 4 16
< H1:HPI-PUMP_EY_PS_PRESS3 4 16
< H1:HPI-PUMP_EY_PS_PRESS4 4 16
< H1:HPI-PUMP_EY_SP_TWEAK 4 16
< H1:HPI-PUMP_EY_SP_TWEAKOUT 4 16
< H1:HPI-PUMP_EY_TWEAKSIZE 4 16
Additions:
294 slow channels were added to the frame (see tar for listing)
1 fast channel was added to the frame
> H1:LSC-REFL_RIN_DQ 4 16384
Tar of maintenance files