H1 General
camilla.compton@LIGO.ORG - posted 16:05, Wednesday 21 June 2023 (70687)
OPS Day Shift Summary

TITLE: 06/21 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning, NLN at 137Mpc.
SHIFT SUMMARY: Busy day today with the IFO input power reduced from 75W to 60W. Most of this mornings changes are documented in alog 70648.
LOG:

Didn't need to change any violin gain settings.

Have NOT reverted the CSOFT P gain (70661).

Start Time System Name Location Lazer_Haz Task Time End
15:18 CAL Jeff CR N Low freq Cal lines on 19:42
15:24 FAC Karen MY N Technical cleaning 16:45
16:19 COMM Sheila LVEA N PSL racks SR785 for measurement 17:26
17:23 External Benton County     Called to say they were doing Emergency Testing 17:26
17:36 FAC Kim MX N Technical Cleaning 20:20
17:40 FAC Karen MY N Technical Cleaning 18:09
18:21 SQZ Naoki, Camilla CR N No SQZ time for 20-30minutes then SQZ time, AS42 offsets reset 70668 19:09
18:26 VAC Janos CP2 N CP2 pump has been started 02:26
19:15 CAL Camilla CR N Sensing function Measurements 70671 19:42
19:15   Joe, Taylor, Julianna MX N Walking down arm 21:24
19:50 COMM Jenne CR N ISS 2nd loop gain change 21:50
20:08 CAL Jeff CR N SRCL offset 20:12
20:10 Water Water tank Water tank N Contractor 21:10
20:12 CAL Camilla CR N Sensing fn measurement (with new different SRCL offset) 70677 20:45
20:50 WAP WAP LVEA, and ALL N LVEA WIFI turned on ?????
20:51 COMM Camilla CR N HAM1 FF off for 5 minutes 70679 20:56
20:52 COMM Sheila LVEA N PSL racks 21:24
21:10 CAL Camilla CR N Calibration measurement 70683 21:42
21:42 SQZ Camilla CR N No SQZ, ASQZ and adjustments 70686 22:31
22:41 CAL Jeff, Louis CR N Pushing Calibration ??????