Immediately after the long lock, green arms looked bad and later PRMI, so I manually tweaked these up. But for DRMI, there were repeated locklosses when ASC was engaged. So I finally decided on an Initial Alignment & this got H1 through DRMI.
Just had a lockloss at a later stage: LASER NOISE SUPPRESSION.
- H1 was in a loop where IMC_LOCK and LASER POWER nodes would complain during LASER NOISE SUPPRESSION.
- IMC_LOCK got stuck in a loop of OPEN ISS and CLOSE ISS and this would result in...
- Laser power dropping to 50W (then LASER POWER would complain of "power not the same as requested") & then laser power ramping up to 60W & then immediately repeat this loop.
- Eventually just lost lock after about 15min of this.