TITLE: 06/23 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY:
Locked at NLN at 13:37, in Observing at 13:58.
All of the Picket-fence seismometers except TOOM (South OR) and PNT (South BC) lost connected around 18:30.
We went out of Observing at 18:53:34 by mistake but we went back into observing 30 seconds later 18:54:04.
We went out of Observing at 19:08 for some planned PEM work at EndX, back into Observing at 20:03. We went out of Observing at 21:37 for some injections.
While trying to stop a transient injections exitation, the CW injections were accidentally stopped at 22:26. Still ongoing trying to get these back up and running.
In and out of Observing as we try to figure it out
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:40 | FAC | Karen | VAC prep, Optics | N | Technical cleaning | 15:20 |
| 15:43 | FAC | Karen | Woodshop | N | Tech clean | 16:32 |
| 17:19 | FAC | Kim | H2 | N | Tech clean | 17:41 |
| 18:58 | PEM | Robert | EndX | N | PEM work | 20:03 |