Out of Observing 12:00 to 12:05UTC for DARM Offset Steps as described in 70835, back in Observing now with H1:AWC-OM2_TSAMS_POWER_SET set to 4.6, sdf accepted for 2 hour test.
As OM2 warms up, our Kappa C is dropping, and reported range increasing, see plot. Our SQZ BLRMs are reporting better squeezing around 100Hz, visible in DARM too, see attached. Unsure if this is real or due to the calibration changing...
No SQZ time with hot OM2 was taken 14:11 to 14:16 UTC. Plot attached.
Optical gain seem to have reduced by ~2%, cavity pole higher by ~3Hz.
Looking closer at the sqz vs. no-sqz times from Camilla, at hot vs. cold OM2 settings, here are some things I notice:
Coherences for a time with lower range (OM2 cold) and higher range (OM2 hot):
https://ldas-jobs.ligo-wa.caltech.edu/~gabriele.vajente/bruco_GDS_1371896710_lower_range/
https://ldas-jobs.ligo-wa.caltech.edu/~gabriele.vajente/bruco_GDS_1371906344_higher_range/
Coherence with jitter is reduced with the hot OM2. Also there is some brodband improvement.
SRCL coherence is slighlty larger when the range is higher, so there might be even more improvement to be gained with a retuned FF.
Also, CHARD_P has larger coherence, while CHARD_Y is slightly better, so I guess the optimal A2L must have changed
Tagging CAL. This is when the OM2 TSAMS heater first gets turned ON during O4. As Camilla indicates, the "ON" button was hit -- i.e. H1:AWC-OM2_TSAMS_POWER_SET was set to 4.6 V at 2023-06-27 12:04:02 UTC (05:04:02 PDT) -- yes, at 5a in the morning on Tuesday prior to Maintenance day; she was on OWL shifts during O4, prior to when owl shifts became remote/on-call. WE were back in observing by 2023-06-27 12:05:30 UTC (05:05:30 PDT). The thermistors on the TSAMS heater unit took much longer to thermalize, with - H1:AWC-OM2_TSAMS_THERMISTOR_1_TEMPERATURE taking *days* to reach equilibrium 33.0 [deg C]. - H1:AWC-OM2_TSAMS_THERMISTOR_2_TEMPERATURE taking *hours* to reach equilibrium at 56.60 [deg C]. Indeed the calibration measurements taken on Tuesday 2023-06-28 01:50 UTC (2023-06-27 18:50 PDT -- see LHO:70902 and LHO:70908), the lock and observation stretch *after* the above mentioned turn on segment was taken in the middle of the THERMISTOR_2_TEMPERATURE thermalization. The TSAMS heater remained ON until 15 days later on 2023-07-12 14:48:47 UTC -- LHO:71285.