Displaying report 1-1 of 1.
Reports until 13:40, Tuesday 27 June 2023
H1 CDS
david.barker@LIGO.ORG - posted 13:40, Tuesday 27 June 2023 - last comment - 13:48, Tuesday 27 June 2023(70881)
CDS Maintenance Summary: Tuesday 27th June 2023

WP11274 Replace HAM6 camera, h1cam15

Fernando, Fil, Betsy, Patrick, Erik, Dave:

h1cam15 (HAM6) camera was replaced (see Fil's alog for details). Patrick install a new server for this camera on h1digivideo3 (was running on h1digivideo1). Erik added the new camera to the DHCP server, I added the new camera to H1EPICS_DIGVIDEO.ini. DAQ restart was required.

WP11276 Add FCES channels to FMCS EPICS

Patrick, Dave:

Patrick added the FCES FMCS channels to his EPICS IOC (see Patrick's alog for details). I added the new channels to H0EPICS_FMCS.ini. DAQ restart was required.

WP11285 CW hardware injection code, use gpstime, discontinue using tconvert

Joe B, Keith R, Mike Thomas, Erik, Dave:

Following LLO, we upgraded the psinject (CW hardware injection) code on h1hwinj1 to no longer use tconvert to get GPS time, and use gpstime instead.

For gpstime to run, the version of python3 needed to be updated from 3.4 to 3.6. Mike did this and reinstalled gpstime.

I applied Joe's changes by "svn up" to get the latest code and verifying the changes.

When we tried to run the new code it would not start. We tracked this down to an install issue, lalapps were removed by the upgrade. Mike re-installed lalapps and the new code is now running.

The first run only ran for about a minute, exiting with an awg-stream error. On the second restart awg-stream connected and the exitation is stable.

WP11278 h1lsc add filtermodules, remove two 16kHz DQ channels

Dave:

I installed the latest h1lsc model (two additional filter modules) and changed the DAQ_Channels block to no longer send the H1:LSC-POPAIR_B_RF[18,90]_I_ERR_16k_DQ channels to the frame. DAQ restart was required.

DAQ Restart

Dave:

The DAQ was restarted twice, first around 10:45 in conjuction with h1lsc model and EDC restarts to apply LSC changes and add the FCES FMCS channels.

A second restart, along with a EDC restart, around 12:46 to add the new h1cam15 channels.

Comments related to this report
david.barker@LIGO.ORG - 13:48, Tuesday 27 June 2023 (70883)

Tue27Jun2023
LOC TIME HOSTNAME     MODEL/REBOOT
10:42:56 h1lsc0       h1lsc       <<< add 2 FM, remove 2 DQ channels


10:43:54 h1daqdc0     [DAQ] <<< 0-leg
10:44:07 h1daqfw0     [DAQ]
10:44:07 h1daqnds0    [DAQ]
10:44:07 h1daqtw0     [DAQ]
10:44:15 h1daqgds0    [DAQ]


10:44:50 h1susauxb123 h1edc[DAQ] <<< EDC add FCES FMCS channels
10:45:36 h1daqgds0    [DAQ] <<< 2nd gds0 restart


10:48:03 h1daqdc1     [DAQ] <<< 1-leg
10:48:12 h1daqfw1     [DAQ]
10:48:12 h1daqtw1     [DAQ]
10:48:13 h1daqnds1    [DAQ]
10:48:21 h1daqgds1    [DAQ]
10:49:06 h1daqgds1    [DAQ] <<< 2nd gds1 restart


12:46:33 h1daqdc0     [DAQ] <<< 0-leg
12:46:45 h1daqfw0     [DAQ]
12:46:45 h1daqtw0     [DAQ]
12:46:46 h1daqnds0    [DAQ]
12:46:54 h1daqgds0    [DAQ]


12:47:20 h1susauxb123 h1edc[DAQ] <<< Add h1cam15 new chans


12:48:00 h1daqgds0    [DAQ] <<< 2nd gds0 restart


12:50:47 h1daqdc1     [DAQ] <<< 1-leg restart
12:50:57 h1daqfw1     [DAQ]
12:50:57 h1daqtw1     [DAQ]
12:50:59 h1daqnds1    [DAQ]
12:51:07 h1daqgds1    [DAQ]
12:51:41 h1daqgds1    [DAQ] <<< 2nd gds1 restart
 

Displaying report 1-1 of 1.