TITLE: 07/01 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 144Mpc
SHIFT SUMMARY:
- Lockloss @ 7:29
- Relocking - the ALS X PLL issue was still apparent - I set the RF minimum threshold to -30 and set the crystal frequency to 0 to reset the beatnote and that seemed to do the trick
- 7:46 - incoming 5.8 EQ from Sri Lanka
- Rest of locking was automated, but did have to hold in OMC WHITENING to damp violins for just under an hour
- 9:31 - incoming 5.1 EQ from Kuril Islands
- Acquired NLN @ 9:31
- EX saturations @ 10:56/13:03/14:12
- 13:56 - incoming 4.8 EQ from Alaska
Leaving H1 to Corey with H1 in observing, going on 5:30 hours. Ground motion has settled from the EQs and all appears to be stable.
LOG:
No log for this shift.