Richard, Corey, Jim, Dave:
At 09:22 the site experienced a power glitch. The MSR UPS went onto battery backup for 3 seconds (logs shown below).
As was the case last Monday, the VFD chassis for the end station HEPI Pump Controllers tripped (see attachment). We don't see any other obvious issues at this time.
Corey is driving to the end stations, with remote support from Jim, to reset the VFD chassis.
Date: 07/01/2023
Time: 09:22:22
Code: 0x0109
Warning - UPS: On battery power in response to an input power problem.
Date: 07/01/2023
Time: 09:22:25
Code: 0x010A
Informational - UPS: No longer on battery power.
EY voltage plot of the three phases shown
Some Additional Notes:
One problem addressed.....looks like ALSx PLL was fine.....now to see how the violins situation will be.