TITLE: 07/07 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY:
- EX saturation @ 19:38
- Planned 2 hrs of commissioning began at 21:00
- Leaving H1 with Ibrahim, locked at NLN (going on a 17 hour stretch) with commissioning ongoing
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:41 | FAC | Christina | LSB -> Staging | N | Forklift 2 crates | 15:11 |
| 15:12 | PCAL | Tony | PCAL Lab | Y (LOCAL) | Measurements | 19:06 |
| 15:27 | FAC | Karen | OSB Fire Pump/Wood Shop | N | Tech clean | 16:40 |
| 17:08 | VAC | Janos | EX | N | Check pumps | 17:30 |
| 17:52 | FAC | Kim | H2 | N | Tech clean | 18:07 |
| 18:18 | FAC | Karen | Optics Lab | N | Tech clean | 18:31 |
| 19:01 | VAC | Gerardo | MX | N | Vac work | 21:18 |
| 20:08 | PCAL | Tony | PCAL Lab | Y (LOCAL) | Measurements | 22:46 |
| 21:00 | SEI | Jim | CR | N | Simulines work | 21:50 |
| 21:51 | CAL | Louis | CR | N | CAL measurement | 22:48 |