Displaying report 1-1 of 1.
Reports until 12:57, Tuesday 11 July 2023
H1 CDS (PEM)
filiberto.clara@LIGO.ORG - posted 12:57, Tuesday 11 July 2023 - last comment - 15:42, Tuesday 18 July 2023(71235)
HAM6 Floor Acceleromter

HAM6 floor accelerometer reported as not working, alog 71133. Cable located in CER connected to the new LIGO accelerometer chassis, channel 12. Other end of cable located on east door of HAM6. Cable previously repaired, short found in cable by HAM6. Cable cut a few feet to eliminate the short. New cable length does not reach the HAM6 floor accelerometer. A short patch cable will be made and installed next Tuesday.

Comments related to this report
filiberto.clara@LIGO.ORG - 15:42, Tuesday 18 July 2023 (71478)

A short patch cable was installed to extend cabling to the HAM6 floor accelerometer. In the CER the accelerometer is connected to the LIGO accelerometer chassis, channel 12.

Displaying report 1-1 of 1.