TITLE: 07/12 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Commissioning
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 6mph Gusts, 4mph 5min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.04 μm/s
QUICK SUMMARY:
8:52 UTC GRB-Short Candidate E416867
ALSX and PCALX Laser Voltage went down IFO Still Locked.
14:48 UTC Went to comissioning for some OMC Alignment work.
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:50 | OMC | Sheila & Naoki | CtrlRm | N | OMC Alignment work | 15:50 |
| 14:52 | FAC | Randy | Mid Y | N | Inventory of HAM Equipment | 16:52 |
More details about "ALSX and PCALX Laser Voltage went down IFO Still Locked." 13:23:41 UTC 06:23:41 PDT 1373203439 Lasers fail 14:48:48 UTC 07:48:48 PDT 1373208546 Out of observing for commissioning see more info in LHO:71257 and LHO:71254.