TITLE: 07/12 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 5mph Gusts, 4mph 5min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.05 μm/s
QUICK SUMMARY:
Currently locked, out of Observing for some OMC Commissioning.
PCALX and ALSX Laser are down. If we lose lock we will go and look into troubleshooting. Not sure about going back into Observing until we have this figured out.
Current plan - As soon as Naoki and Sheila are done with their commissioning work, around 10am, Fil wil head to EX to troubleshoot the interlock system failure. There is a large possibility that this will bring all lasers down on site and we will need to recover at that point.
FRS https://services1.ligo-la.caltech.edu/FRS/show_bug.cgi?id=28492