PSL Recovered after EX Interlock Work

After today's EX interlock work, I have recovered the PSL.  Everything came back without issue.  When engaging the ISS, I had to adjust the RefSignal from -2.0 V to -2.02 V to get the diffraction % to ~2.5%.  For the EVE operator, if the diffraction % drifts low as the laser continues to warm up over the next few hours (which we've seen in the past), the RefSignal will need to be adjusted again.

Comments related to this report
ryan.short@LIGO.ORG - 18:18, Wednesday 12 July 2023 (71278)

The diffracted power had indeed drifted low as the laser warmed up, so I tapped the Ref Signal from -2.02 V to -2.01 V to get the diffracted power back closer to ~2.5%