TITLE: 07/13 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY:
15:00 Detector locked and observing for 5:02
16:25 Left Observing for Commissioning
Alternating between NLN_CAL_MEAS and NOMINAL_LOW_NOISE for 5 mins each (71295):
- 16:25:13 NLN_CAL_MEAS
- 16:30:57 NOMINAL_LOW_NOISE
- 16:35:21 NLN_CAL_MEAS
- 16:41:21 NOMINAL_LOW_NOISE
- 16:46:18 NLN_CAL_MEAS
- 16:51:43 NOMINAL_LOW_NOISE
17:01 Commissioning done, back into NLN and Observing
18:14 Out of Observing, Commissioning started
- 19:22 CAL measurement started
- 21:13 CAL measurement ended
23:00 Commissioning wrapping up. Interferometer has been Locked for 13:01.
Handing off to Ryan S.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 13:36 | FAC | Cindi | Weld Shop | N | Technical cleaning | 14:36 |
| 16:30 | - | Marc | MY | n | Looking for parts | 17:13 |
| 16:40 | CAL | Jenne, Oli | RM | n | Alternate between NLN and NLN_CAL_MEAS for 5 mins each | 17:03 |
| 16:48 | PEM | Robert | CER | n | Going into CER | 18:13 |
| 16:56 | PCAL | Rick | PCAL Lab | y (local) | Pcal | 18:26 |
| 17:13 | FAC | Karen | Opt Lab | n | Tech clean | 17:28 |
| 18:18 | SEI | Jim | MX | n | Look at HEPI piers | 18:54 |