Reports until 08:03, Saturday 15 July 2023
H1 General
camilla.compton@LIGO.ORG - posted 08:03, Saturday 15 July 2023 - last comment - 08:26, Saturday 15 July 2023(71348)
OPS Day Shift Start

TITLE: 07/15 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 133Mpc
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 3mph Gusts, 3mph 5min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.04 μm/s
QUICK SUMMARY: Locked in NLN for 14h22. Range been between 132-136MPc over the last hour.

Corey notes if LLO goes down we should run the pydarm measure --run-headless bb command following the Taking Calibration Measurements Wiki

Comments related to this report
camilla.compton@LIGO.ORG - 08:26, Saturday 15 July 2023 (71349)CDS

I restarted the frozen out-building wind channels following 66769 (also noted in the wiki),Tagging CDS. SEI, SUS, VAC, CDS , dust monitors okay. Known issue that PSL ISS diffracted power is low, attached plot.

Images attached to this comment