Displaying report 1-1 of 1.
Reports until 16:04, Monday 17 July 2023
H1 General (DetChar)
camilla.compton@LIGO.ORG - posted 16:04, Monday 17 July 2023 (71416)
OPS Day Shift Summary

TITLE: 07/17 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
SHIFT SUMMARY: Two locklosses during today's shift. There is some wind picking up now.
LOG:

Ryan S will turn off violin damping (and monitor violins) at 7.45am to check violin damping at lock losses isn't ringing up violins.
Ryan C will need to accept h1oaf H1:OAF-RANGE_RBP_9 filter changes is sdf (from alog 71418).
Start Time System Name Location Lazer_Haz Task Time End
15:00 FAC Karen Optics Lab, Vac Prep N Technical Cleaning 15:27
15:11 FAC Kim MX n Tech Clean 15:59
15:32 S&K Ken VPW N Lights 21:34
15:59 FAC Karen MY n Tech Clean 16:51
16:58 FAC Chris MX/MY n   18:25
17:01 FAC Kim H2 N Technical Cleaning 18:13
17:45 PSL Jason CR N ISS diff power change 17:46
17:48 CDS Erik CR N restart readonly nuc26 17:49
17:57 GRD TJ CR N GRD manager testing 19:36
17:58 FAC Karen, Kim High Bay N Technincal Cleaning 18:13
18:53 COMM Gabriele Remote/TS N fewHz injections into ASC centering loops 71406 19:50
19:37 COMM Camilla CR N editing OAF-RANGE_RBP_9 filters 19:50
20:16 PCAL Rick PCAL lab N PCAL ongoing
20:49 VAC Janos, Adam B MY n Hepta work ongoing
20:59 EE Fil, Marc MSR, CUR, CR N Pulling fiber to fire panel (@21:19UTC floor being removed, loud noise, tagging DetChar) ongoing
21:03 PCAL Tony PCAL Lab N PCAL ongoing
22:13 EQ       Earthqake from Alaska coming through 22:23
22:27 PEM Robert LVEA N Viewport work - IFO to commisioing 22:45
22:39 VAC Dave   n Vacuum CP1 restart - IFO in commissioning 22:41
Displaying report 1-1 of 1.