TITLE: 07/18 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Preventative Maintenance
SHIFT SUMMARY: Large earthquake caused a lockloss about halfway through the shift, then spent the remaining time relocking and damping violins until scheduled injections began.
Lock #1:
Lock #2:
Handing off to Tony for the day.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 08:58 | SUS | Rahul | Remote | - | Tweaking violin damping gains | 10:40 |
| 12:15 | ISC | Ryan S | CR | - | DHARD_Y measurement | 13:01 |
| 13:29 | CDS | Erik | Remote | - | Rebooting workstations, opslogin0, cdsssh | 13:49 |
| 14:02 | FAC | Ken | VPW | - | Conduit installation | Ongoing |
| 14:21 | PEM | PEM_MAG_INJ GRD | CR | - | Magnetic injection suite | 14:40 |
| 15:00 | FAC | Tyler, Chris | Outbuildings | - | Fan checks | Ongoing |
| 15:04 | FAC | Cindi | OSB Receiving | n | Supplies | Ongoing |
| 15:06 | - | Jeff | LVEA | n | Taking photos | Ongoing |
| 15:09 | VAC | Gerardo | LVEA | - | Check turbopumps | Ongoing |