Reports until 16:07, Thursday 20 July 2023
H1 General
anthony.sanchez@LIGO.ORG - posted 16:07, Thursday 20 July 2023 (71571)
Thursday Ops Day Shift End

TITLE: 07/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 146Mpc
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 7mph Gusts, 5mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.04 μm/s 
QUICK SUMMARY:

First thing in the mornig Livingston called to say their is disruptive logging preventing them from locking

LHO has taken a target of Opertunity to do some commishining.

Lockloss 18:14 UTC
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=71553

Relocking: Went really well with H1 Manager, Got up to OMC_Whitening without any intervention.

19:25 UTC Lockloss due to a Button Pusher, pushing a button.
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=71568

Lockloss again Likely due to poor alignment.
 https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=71568

Started an initial alignment
Got stuck in SRC align agian, Skipped it, by just taking ISC_LOCK to init NOMINAL_LOW_NOISE.
Once ISC_LOCK was moving up in states it didn't have any problems acheiving lock.
 
H1 Manager re-enabled
Made it back to OMC_WHITENING @ 21:35
NLN reached at 22:22UTC and Observing at 22:28

                                                                                                                                                    

Start Time System Name Location Lazer_Haz Task Time End
13:46 ISC Ryan S CR - MICHFF measurement 13:55
14:40 ISC Gabriele Remote - MICHFF filter change 15:00
15:01 FAC Ken OSB Rec - Lights (scissor lift) 17:01
16:19 PEM Robert, & Crew LVEA N PEM Work 19:38
16:19 Commish Gabriele Remote N Feed forward adjustment 16:25
16:28 FAC Karen Optics lab N Technical Cleaning 16:58
17:06 SQZ vICKY rEMOTE n SQZr work 18:15
17:23 FAC Karen Woodshop N Technical cleaning. 17:33
18:27 SEI Jim HAM8 N Looking for a location to mount new tools 18:30
19:54 FAC Randy Ey & EX N Mech Room Work 21:36
20:46 Ops Ibrahim VPW& Staging N Taking a \ 21:46
21:02 receiving Christina OSB Receiving N Rolling up the Roll up doors in the Receiving room. 21:47
21:40 Receiving Christina H2 building N Inventory 22:40
21:47 SRC Gabriele Remote N SRC FF Adjustments 22:26