TITLE: 07/27 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Aligning
SHIFT SUMMARY: A little over and hour this morning for calibration and SQZ tuning. We lost lock at 2124UTC ending a 24 hour lock. Relocking has been a great test for our H1_MANAGER node and the IFO_NOTIFY/calling system as we had Find_IR fail and HEPI HAM2 trip with a coefficient load. I forced an initial alignment which ran autonomously. Ryan is now bringing it back up.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 16:17 | CAL | TJ | CR | n | CAL measurement | 16:44 |
| 16:17 | FAC | Cindi | MY | n | Tech clean | 17:54 |
| 16:44 | SQZ | Camilla | CR | n | SQZ NLG tuning | 16:59 |
| 17:00 | SQZ | Vicky, Camilla | CR,remote | n | SQZ tuning | 17:31 |
| 17:24 | PEM | Richard | FCTE | n | Retrieving temperature sensors | 17:48 |