Displaying report 1-1 of 1.
Reports until 15:55, Monday 31 July 2023
H1 General (SQZ)
ryan.crouch@LIGO.ORG - posted 15:55, Monday 31 July 2023 (71844)
OPS Monday day shift summary

TITLE: 07/31 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 146Mpc
SHIFT SUMMARY: The squeezer lost lock a few times and kicked us out of observing, 1 lockloss with an automated relock. Handing off to RyanS

Lock#1:

Squeezer ISS took us out of commissioning from 15:59UTC to 16:09UTC

Lockloss @ 16:31UTC

Lock#2:

Couldn't get DRMI or PRMI, went to CHECK_MICH then back to PRMI then lockloss 16:54 UTC

Lock#3

Couldn't get DRMI or PRMI (2nd try) so H1MANAGER took us to initial alignment as expected, which went smoothly. We were then able to lock DRMI within 30 seconds during the following relocking.

Back into NLN at 18:05TUC and Observing at 18:26UTC. **Fully automated relock with an automated initial alignment**

We lost connection to the CDS_WAP_{EX,EY,LVEA}_STATUS briefly (~50 seconds) at 21:55UTC which are and were all off

Superevent S230731an

LOG:                                                                                                                   

Start Time System Name Location Lazer_Haz Task Time End
17:34 FAC Karen Optics lab, VAC prep N Tech clean 17:53
19:01 SEI Jim Mezz N Parts/tools search 19:06
19:27 CAL Gabriele Remote N CHARD_Y measurement 20:48
20:28 VAC Travis & Jordan Optics lab N Disassembly of a setup 21:56
21:09 FAC Ken MY n Light fixtures back 22:10