TITLE: 07/31 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 146Mpc
SHIFT SUMMARY: The squeezer lost lock a few times and kicked us out of observing, 1 lockloss with an automated relock. Handing off to RyanS
Lock#1:
Squeezer ISS took us out of commissioning from 15:59UTC to 16:09UTC
Lockloss @ 16:31UTC
Lock#2:
Couldn't get DRMI or PRMI, went to CHECK_MICH then back to PRMI then lockloss 16:54 UTC
Lock#3
Couldn't get DRMI or PRMI (2nd try) so H1MANAGER took us to initial alignment as expected, which went smoothly. We were then able to lock DRMI within 30 seconds during the following relocking.
Back into NLN at 18:05TUC and Observing at 18:26UTC. **Fully automated relock with an automated initial alignment**
We lost connection to the CDS_WAP_{EX,EY,LVEA}_STATUS briefly (~50 seconds) at 21:55UTC which are and were all off
Superevent S230731an
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 17:34 | FAC | Karen | Optics lab, VAC prep | N | Tech clean | 17:53 |
| 19:01 | SEI | Jim | Mezz | N | Parts/tools search | 19:06 |
| 19:27 | CAL | Gabriele | Remote | N | CHARD_Y measurement | 20:48 |
| 20:28 | VAC | Travis & Jordan | Optics lab | N | Disassembly of a setup | 21:56 |
| 21:09 | FAC | Ken | MY | n | Light fixtures back | 22:10 |